A. ALLAHVERDİ And T. Aldowaisan, "Job lateness in flowshops with setup and removal times separated," JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY , no.9, pp.1001-1006, 1998
ALLAHVERDİ, A. And Aldowaisan, T. 1998. Job lateness in flowshops with setup and removal times separated. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY , no.9 , 1001-1006.
ALLAHVERDİ, A., & Aldowaisan, T., (1998). Job lateness in flowshops with setup and removal times separated. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY , no.9, 1001-1006.
ALLAHVERDİ, ALİ, And T Aldowaisan. "Job lateness in flowshops with setup and removal times separated," JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY , no.9, 1001-1006, 1998
ALLAHVERDİ, ALİ And Aldowaisan, T. "Job lateness in flowshops with setup and removal times separated." JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY , no.9, pp.1001-1006, 1998
ALLAHVERDİ, A. And Aldowaisan, T. (1998) . "Job lateness in flowshops with setup and removal times separated." JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY , no.9, pp.1001-1006.
@article{article, author={ALİ ALLAHVERDİ And author={T Aldowaisan}, title={Job lateness in flowshops with setup and removal times separated}, journal={JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY}, year=1998, pages={1001-1006} }