Increasing the efficiency of production planning activities by using machine learning methods in standard time calculation


Thesis Type: Postgraduate

Institution Of The Thesis: Gazi University, Fen Bilimleri Enstitüsü, -, Turkey

Approval Date: 2024

Thesis Language: Turkish

Student: Halil Erkan AKDOĞAN

Supervisor: Burcu Yılmaz Kaya

Open Archive Collection: AVESIS Open Access Collection

Abstract:

Standard time calculations are critical processes that form the foundation of production and planning activities, aimed at reducing costs and meeting customer demands on time. Time studies, one of the most frequently used traditional work measurement methods in standard time calculations, are widely preferred both in scientific literature and in field applications for determining the correct standard time and analyzing performance levels by calculating basic, rest, and distribution times in appropriate production and service systems. However, in cases where direct work measurement methods are insufficient due to factors such as long cycles, one-off orders, production processes with high manual labor rates, or high variability in part geometry due to demand, indirect work measurement methods such as estimation and comparison need to be preferred. In this study, for the production planning activities carried out for product families with high variability and intensive manual labor of a large-scale company operating in the defense industry, standard times that cannot be calculated with traditional methods were first calculated with traditional regression estimation models predominantly preferred in the literature. Then, leveraging advancements in today's computing technologies and data science, artificial neural networks, support vector machines, and random forest machine learning algorithms were employed. The calculated standard times were analyzed in depth based on four different performance metrics, their output reliabilities were interpreted comparatively, and the results were supported with explanatory visuals.

Key Words : Work measurement, machine learning, support vector machines, artificial neural networks, random forest, standard time