A chance-constrained approach to stochastic line balancing problem
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, cilt.180, ss.1098-1115, 2007 (SCI-Expanded, Scopus)
- Yayın Türü: Makale / Tam Makale
- Cilt numarası: 180
- Basım Tarihi: 2007
- Doi Numarası: 10.1016/j.ejor.2006.04.042
- Dergi Adı: EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
- Derginin Tarandığı İndeksler: Science Citation Index Expanded (SCI-EXPANDED), Scopus
- Sayfa Sayıları: ss.1098-1115
- Anahtar Kelimeler: production, U-line balancing, ASSEMBLY LINES, TIMES
- Açık Arşiv Koleksiyonu: AVESİS Açık Erişim Koleksiyonu
- Gazi Üniversitesi Adresli: Evet
Özet
in this paper, chance-constrained 0-1 integer programming models for the stochastic traditional and U-type line balancing (ULB) problem are developed. These models are solved for several test problems that are well known in the literature and the computational results are given. In addition, a goal programming approach is presented in order to increase the system reliability, which is arising from the stochastic case. (c) 2006 Elsevier B.V. All rights reserved.