THE MINIMIZATION OF ABSOLUTE DEVIATION FROM COMMON DUE DATE IN TWO MACHINE FLOWSHOP SCHEDULING WITH LEARNING EFFECT
JOURNAL OF THE FACULTY OF ENGINEERING AND ARCHITECTURE OF GAZI UNIVERSITY, cilt.24, sa.2, ss.351-357, 2009 (SCI-Expanded, Scopus, TRDizin)
- Yayın Türü: Makale / Tam Makale
- Cilt numarası: 24 Sayı: 2
- Basım Tarihi: 2009
- Dergi Adı: JOURNAL OF THE FACULTY OF ENGINEERING AND ARCHITECTURE OF GAZI UNIVERSITY
- Derginin Tarandığı İndeksler: Science Citation Index Expanded (SCI-EXPANDED), Scopus, TR DİZİN (ULAKBİM)
- Sayfa Sayıları: ss.351-357
- Gazi Üniversitesi Adresli: Evet
Özet
The phenomenon of the learning effect has been extensively studied in many different areas of operational research. However, there have been a few studies in the general context of production scheduling; also there have been fewer studies in flow-shop.