Three-machine flowshop scheduling problem to minimize maximum lateness with bounded setup and processing times


ALLAHVERDİ A.

Journal of Operations and Logistics, cilt.2, ss.1-11, 2009 (Hakemli Dergi)

  • Yayın Türü: Makale / Tam Makale
  • Cilt numarası: 2
  • Basım Tarihi: 2009
  • Dergi Adı: Journal of Operations and Logistics
  • Sayfa Sayıları: ss.1-11
  • Gazi Üniversitesi Adresli: Hayır