Resource Constrained Project Scheduling with Stochastic Resources


UYSAL F., İŞLEYEN S. K. , ÇETİNKAYA C.

Journal of Applied Research on Industrial Engineering, vol.5, no.1, pp.39-49, 2018 (Refereed Journals of Other Institutions)

  • Publication Type: Article / Article
  • Volume: 5 Issue: 1
  • Publication Date: 2018
  • Doi Number: 10.22105/jarie.2018.98906.1019
  • Title of Journal : Journal of Applied Research on Industrial Engineering
  • Page Numbers: pp.39-49