Risk Assessment for Electricity Generation Management Process with SWARA Based Fuzzy TOPSIS Method


Creative Commons License

Karamollaoglu H., Yucedag I., DOĞRU İ. A.

JOURNAL OF POLYTECHNIC-POLITEKNIK DERGISI, 2022 (ESCI) identifier

  • Yayın Türü: Makale / Tam Makale
  • Basım Tarihi: 2022
  • Doi Numarası: 10.2339/politeknik.917535
  • Dergi Adı: JOURNAL OF POLYTECHNIC-POLITEKNIK DERGISI
  • Derginin Tarandığı İndeksler: Emerging Sources Citation Index (ESCI), TR DİZİN (ULAKBİM)
  • Anahtar Kelimeler: SWARA, Fuzzy TOPSIS, electricity generation management process, risk analysis, SAFETY RISK, VIKOR, FMEA
  • Gazi Üniversitesi Adresli: Evet

Özet

In the successful maintenance of electricity generation management processes in power generation plants, it is of great importance to determine the risks that may arise during the operation of the relevant processes, take measures to minimize these risks, and take the necessary actions. In this study, common risks in the electricity generation management process in HEPPs were identified and these risks were rated by experts (decision-makers) within each power plant itself. Since this rating is made by the experts of each power plant, the impact and probability values of the same risk may differ, and accordingly, different risk levels may arise for the same risk. In the study, the SWARA method was used to compare the risk levels of common risks in the electricity generation process in different power plants and calculate the final weight values of the related risks. As a result of the measures determined for each risk in the electricity generation management processes in the power plants and the actions taken for these measures, it was determined whether the relevant risks were reduced to acceptable levels by looking at the results of the internal audits. In the internal audits, the performance of HEPPs in eliminating the related risks is evaluated with fuzzy expressions separately for each risk. The risk weight values obtained by the SWARA method and the fuzzy expressions obtained as a result of the risk assessment were analyzed with the Fuzzy TOPSIS method, and the performance values of the power plants in eliminating the risks were calculated, then the performance ranking was made in the light of these values.