COST ORIENTED STOCHASTIC ASSEMBLY LINE BALANCING PROBLEM


Creative Commons License

Foroughi A., Gökçen H.

JOURNAL OF THE FACULTY OF ENGINEERING AND ARCHITECTURE OF GAZI UNIVERSITY, cilt.29, ss.469-476, 2014 (SCI-Expanded) identifier identifier

  • Yayın Türü: Makale / Tam Makale
  • Cilt numarası: 29
  • Basım Tarihi: 2014
  • Dergi Adı: JOURNAL OF THE FACULTY OF ENGINEERING AND ARCHITECTURE OF GAZI UNIVERSITY
  • Derginin Tarandığı İndeksler: Science Citation Index Expanded (SCI-EXPANDED), Scopus, TR DİZİN (ULAKBİM)
  • Sayfa Sayıları: ss.469-476
  • Anahtar Kelimeler: Cost Oriented Assembly Line Balancing, Stochastic Task Time, Chance Constraint Programming, SIMULATED ANNEALING APPROACH, HEURISTIC METHODS, TIMES
  • Gazi Üniversitesi Adresli: Evet

Özet

In today's business that need for economic studies are significant, evaluation and effective use of resources is a very important issue. Therefore, in assembly lines, reduction of costs and benefit from resources such as labor efficiently has become imperative. In this paper the chance constraint mathematical model for stochastic cost oriented assembly line balancing problem has been proposed. The proposed model, have been solved for small to medium-sized problems with using IBM ILOG CPLEX 12.4 solver. Obtained the best solutions were compared with the time oriented assembly line balancing results in terms of the number of station and total labor costs.