Investigation of the Effects of Constrained Source Conditions on the Structure Cost


Kanit R., Baykan U. N., ERDAL M.

JOURNAL OF POLYTECHNIC-POLITEKNIK DERGISI, cilt.8, sa.2, ss.209-221, 2005 (ESCI) identifier

  • Yayın Türü: Makale / Tam Makale
  • Cilt numarası: 8 Sayı: 2
  • Basım Tarihi: 2005
  • Dergi Adı: JOURNAL OF POLYTECHNIC-POLITEKNIK DERGISI
  • Derginin Tarandığı İndeksler: Emerging Sources Citation Index (ESCI), TR DİZİN (ULAKBİM)
  • Sayfa Sayıları: ss.209-221
  • Anahtar Kelimeler: Constrained resources, Cost planning, Project scheduling, Cost, Cost estimation
  • Gazi Üniversitesi Adresli: Evet

Özet

It is expected that all necessary sources needed for a construction project has to be included in the project at the required time with necessary amount like the other sectors. However under constrained source conditions, these expectations could not always be satisfied. Effects of source assignments on the cost and completion time of the structure have to be known during the planning stage by both investor and the contractor. In this study, effects of constraints on the workmanship sources to the project cost and time were investigated for a village clinic construction project at which the cost of the necessary sources were calculated according to the Ministry of Public Works' pricing system.