THE MINIMIZATION OF ABSOLUTE DEVIATION FROM COMMON DUE DATE IN TWO MACHINE FLOWSHOP SCHEDULING WITH LEARNING EFFECT


Isler M. C. , Celik V., TOKLU B.

JOURNAL OF THE FACULTY OF ENGINEERING AND ARCHITECTURE OF GAZI UNIVERSITY, cilt.24, ss.351-357, 2009 (SCI İndekslerine Giren Dergi) identifier identifier

  • Cilt numarası: 24 Konu: 2
  • Basım Tarihi: 2009
  • Dergi Adı: JOURNAL OF THE FACULTY OF ENGINEERING AND ARCHITECTURE OF GAZI UNIVERSITY
  • Sayfa Sayıları: ss.351-357

Özet

The phenomenon of the learning effect has been extensively studied in many different areas of operational research. However, there have been a few studies in the general context of production scheduling; also there have been fewer studies in flow-shop.