THE MINIMIZATION OF ABSOLUTE DEVIATION FROM COMMON DUE DATE IN TWO MACHINE FLOWSHOP SCHEDULING WITH LEARNING EFFECT


Isler M. C., Celik V., TOKLU B.

JOURNAL OF THE FACULTY OF ENGINEERING AND ARCHITECTURE OF GAZI UNIVERSITY, cilt.24, sa.2, ss.351-357, 2009 (SCI-Expanded) identifier identifier

Özet

The phenomenon of the learning effect has been extensively studied in many different areas of operational research. However, there have been a few studies in the general context of production scheduling; also there have been fewer studies in flow-shop.