Atıf İçin Kopyala
Demir Y., İŞLEYEN S. K.
JOURNAL OF INTELLIGENT MANUFACTURING, cilt.25, sa.1, ss.209-211, 2014 (SCI-Expanded)
-
Yayın Türü:
Makale / Tam Makale
-
Cilt numarası:
25
Sayı:
1
-
Basım Tarihi:
2014
-
Doi Numarası:
10.1007/s10845-012-0693-y
-
Dergi Adı:
JOURNAL OF INTELLIGENT MANUFACTURING
-
Derginin Tarandığı İndeksler:
Science Citation Index Expanded (SCI-EXPANDED), Scopus
-
Sayfa Sayıları:
ss.209-211
-
Gazi Üniversitesi Adresli:
Evet
Özet
In this note, we show that there are some errors in the 0-1 integer programming model in recent paper [Scheduling jobs and maintenances in flexible job shop with a hybrid genetic algorithm 17 (2006) 493-507]. We point out these errors and correct them.