Biyografi
Ali Allahverdi is a Professor in the Department of Industrial Engineering of Gazi
University since May 2023. Before this appointment, he served as a faculty
member in the Department of Industrial and Management Systems Engineering of
Kuwait University from September 15, 1995 to May 15, 2023. He worked for two
years at
Duyurular & Dokümanlar
Ders Notu
Duyuru
IE 207 Probability Student MyLab Registration Instruction 2025 Fall (TR-01)
IE 207 Probability Student MyLab Registration Instruction 2025 Fall (TR-02)
Ödev
Dosya İndir
Eğitim Bilgileri
1990 - 1992
1990 - 1992Doktora
Rensselaer Polytechnic Institute, College of Engineering, Industrial Engineering Department, Amerika Birleşik Devletleri
1988 - 1990
1988 - 1990Yüksek Lisans
Rensselaer Polytechnic Institute, College of Engineering, Industrial Engineering Department, Amerika Birleşik Devletleri
1982 - 1986
1982 - 1986Lisans
İstanbul Teknik Üniversitesi, Türkiye
Yaptığı Tezler
1992
1992Bütünleşik Doktora
Scheduling on multiple unreliable sources
Rensselaer Polytechnic Institute, College of Engineering, Department of Industrial Engineering
Yabancı Diller
C2 Ustalık
C2 Ustalıkİngilizce
Araştırma Alanları
Çizelgeleme (Scheduling)
Akademik Ünvanlar / Görevler
2023 - Devam Ediyor
2023 - Devam EdiyorProf. Dr.
Gazi Üniversitesi, -, Faculty of Engineering, Industrial Engineering Department
2003 - 2023
2003 - 2023Prof. Dr.
Kuwait University, College of Engineering, Industrial Engineering Department
2010 - 2011
2010 - 2011Prof. Dr.
Rensselaer Polytechnic Institute, College of Engineering, Industrial Engineering Department
1998 - 2003
1998 - 2003Doç. Dr.
Kuwait University, College of Engineering, Industrial Engineering Department
1995 - 1998
1995 - 1998Yrd. Doç. Dr.
Kuwait University, College of Engineering, Industrial Engineering Department
1993 - 1995
1993 - 1995Yrd. Doç. Dr.
Marmara Üniversitesi, Mühendislik Fakültesi, Industrial Engineering Department
1989 - 1992
1989 - 1992Araştırma Görevlisi
Rensselaer Polytechnic Institute, College of Engineering, Industrial Engineering Department
1987 - 1989
1987 - 1989Araştırma Görevlisi
İstanbul Teknik Üniversitesi
Makaleler
2025
20251. From cradle to grave: evaluating bread production and waste using multicriteria optimization and life cycle assessment
Aljaber S., Aleisa E., ALLAHVERDİ A.
Journal of Material Cycles and Waste Management
, cilt.27, sa.4, ss.2684-2698, 2025 (SCI-Expanded, Scopus)
2023
20232. Three-Machine Flowshop Scheduling Problem to Minimize Makespan with Interval Processing Times
ALLAHVERDİ A., Allahverdi M.
International Journal of Advanced Research in Engineering Innovation , 2023 (Hakemli Dergi)
2023
20233. Algorithms for three-machine flowshop scheduling problem to minimize makespan with uncertain processing times
Allahverdi A., Allahverdi M.
RAIRO-OPERATIONS RESEARCH
, cilt.57, sa.4, ss.1733-1743, 2023 (SCI-Expanded, Scopus)
2022
20224. More effective heuristics for a two-machine no-wait flowshop to minimize maximum lateness
Aydilek H., Aydilek A., Allahverdi M., Allahverdi A.
International Journal of Industrial Engineering Computations
, cilt.13, sa.4, ss.543-556, 2022 (SCI-Expanded, Scopus)
2022
20225. An algorithm for a no-wait flowshop scheduling problem for minimizing total tardiness with a constraint on total completion time
Allahverdi A., Aydilek H., Aydilek A.
INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING COMPUTATIONS
, cilt.13, sa.1, ss.43-50, 2022 (SCI-Expanded, Scopus)
2022
20226. A survey of scheduling problems with uncertain interval/bounded processing/setup times
ALLAHVERDİ A.
JOURNAL OF PROJECT MANAGEMENT
, cilt.7, sa.4, ss.255-264, 2022 (ESCI, Scopus)
2022
20227. A Review of Scheduling Problems with Bounded Processing/Setup Times
Allahverdi A.
International Journal of Advanced Research in Engineering Innovation , cilt.4, ss.64-69, 2022 (Hakemli Dergi)
2021
20218. Algorithms to minimize total completion time in a two-machine flowshop problem with uncertain set-up times
Aydilek H., Aydilek A., Allahverdi A.
ENGINEERING OPTIMIZATION
, sa.8, ss.1417-1430, 2021 (SCI-Expanded, Scopus)
2021
20219. A BETTER DOMINANCE RELATION AND HEURISTICS FOR TWO-MACHINE NO-WAIT FLOWSHOPS WITH MAXIMUM LATENESS PERFORMANCE MEASURE
Allahverdi M., Aydilek H., Aydilek A., Allahverdi A.
JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION
, sa.4, ss.1973-1991, 2021 (SCI-Expanded, Scopus)
2021
202110. Minimizing total completion time for flowshop scheduling problem with uncertain processing times
Allahverdi M., Allahverdi A.
RAIRO-OPERATIONS RESEARCH
, 2021 (SCI-Expanded, Scopus)
2021
202111. Asean Journal of Engineering Education
Allahverdi A., Alhashemi J., Sarkar K.
Asean Journal of Engineering Education , cilt.5, ss.23-29, 2021 (Hakemli Dergi)
2021
202112. A Recent Senior Design Project of the Industrial and Management Systems Engineering Program at Kuwait University
Allahverdi A.
International Journal of Advanced Research in Education and Society , cilt.3, ss.138-144, 2021 (Hakemli Dergi)
2021
202113. Industrial and Management Systems Engineering program assessment based on the new ABET student outcomes
Allahverdi A., Alhashemi J., Sarkar K.
Asean Journal of Engineering Education , cilt.5, ss.1-8, 2021 (Hakemli Dergi)
2021
202114. Four-machine flowshop scheduling problem with uncertain processing times to minimize mean completion time
Allahverdi M., ALLAHVERDİ A.
International Journal of Business and Technology Management , cilt.3, ss.44-48, 2021 (Hakemli Dergi)
2021
202115. An Improved Algorithm for Minimizing Makespan on Flowshops with Uncertain Processing Times
Allahverdi A., Allahverdi M.
International Journal of Engineering Research and Development , cilt.13, ss.521-530, 2021 (Hakemli Dergi)
2020
202016. MINIMIZING TOTAL COMPLETION TIME IN A TWO-MACHINE NO-WAIT FLOWSHOP WITH UNCERTAIN AND BOUNDED SETUP TIMES
Allahverdi M., Allahverdi A., Lin B. M.
JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION
, sa.5, ss.2439-2457, 2020 (SCI-Expanded, Scopus)
2020
202017. Algorithms for four-machine flowshop scheduling problem with uncertain processing times to minimize makespan
Allahverdi M., Allahverdi A.
RAIRO-OPERATIONS RESEARCH
, sa.2, ss.529-553, 2020 (SCI-Expanded, Scopus)
2020
202018. Sample Senior Design Projects of Industrial Engineering Program at Kuwait University
ALLAHVERDİ A.
ASEAN Journal of Engineering Education , cilt.4, ss.11-18, 2020 (Hakemli Dergi)
2020
202019. No-wait flowshop scheduling problem with separate setup times to minimize total tardiness subject to makespan
Allahverdi A., Aydilek H., Aydilek A.
APPLIED MATHEMATICS AND COMPUTATION
, 2020 (SCI-Expanded, Scopus)
2018
201820. Two-machine no-wait flowshop scheduling problem with uncertain setup times to minimize maximum lateness
Allahverdi A., Allahverdi M.
COMPUTATIONAL & APPLIED MATHEMATICS
, sa.5, ss.6774-6794, 2018 (SCI-Expanded)
2018
201821. Scheduling in manufacturing systems: new trends and perspectives
Allahverdi A., Pesch E., Pinedo M., Werner F.
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
, sa.19, ss.6333-6335, 2018 (SCI-Expanded, Scopus)
2018
201822. No-wait flowshop scheduling problem with two criteria; total tardiness and makespan
Allahverdi A., Aydilek H., Aydilek A.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
, sa.2, ss.590-601, 2018 (SCI-Expanded, Scopus)
2018
201823. Samples of senior design projects in industrial engineering
Allahverdi A.
Global Journal of Engineering Education
, cilt.20, sa.3, ss.213-216, 2018 (Scopus)
2018
201824. Minimizing mean completion time for a two-machine no-wait flowshop scheduling problem
Allahverdi M., ALLAHVERDİ A.
CONTEMPORARY ISSUES IN BUSINESS & ECONOMICS , ss.270-273, 2018 (Hakemli Dergi)
2017
201725. Algorithms for minimizing the number of tardy jobs for reducing production cost with uncertain processing times
Aydilek A., Aydilek H., Allahverdi A.
APPLIED MATHEMATICAL MODELLING
, ss.982-996, 2017 (SCI-Expanded, SSCI, Scopus)
2017
201726. Minimising maximum tardiness in assembly flowshops with setup times
Aydilek A., Aydilek H., Allahverdi A.
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
, sa.24, ss.7541-7565, 2017 (SCI-Expanded, Scopus)
2016
201627. A survey of scheduling problems with no-wait in process
Allahverdi A.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
, sa.3, ss.665-686, 2016 (SCI-Expanded, Scopus)
2016
201628. Two-stage assembly scheduling problem for minimizing total tardiness with setup times
Allahverdi A., Aydilek H., Aydilek A.
APPLIED MATHEMATICAL MODELLING
, sa.17-18, ss.7796-7815, 2016 (SCI-Expanded, Scopus)
2016
201629. Continuous improvement in the Industrial and Management Systems Engineering programme at Kuwait University
Aldowaisan T., Allahverdi A.
EUROPEAN JOURNAL OF ENGINEERING EDUCATION
, sa.4, ss.369-379, 2016 (ESCI, Scopus)
2016
201630. Improving educational objectives of the Industrial and Management Systems Engineering programme at Kuwait University
Aldowaisan T., Allahverdi A.
EUROPEAN JOURNAL OF ENGINEERING EDUCATION
, sa.3, ss.252-262, 2016 (ESCI, Scopus)
2016
201631. Minimizing the number of tardy jobs on a two-stage assembly flowshop
Allahverdi A., Aydilek A., Aydilek H.
JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING
, sa.6, ss.391-403, 2016 (ESCI, Scopus)
2015
201532. The third comprehensive survey on scheduling problems with setup times/costs
Allahverdi A.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
, sa.2, ss.345-378, 2015 (SCI-Expanded, Scopus)
2015
201533. Production in a two-machine flowshop scheduling environment with uncertain processing and setup times to minimize makespan
Aydilek A., Aydilek H., Allahverdi A.
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
, sa.9, ss.2803-2819, 2015 (SCI-Expanded, Scopus)
2015
201534. The two stage assembly flowshop scheduling problem to minimize total tardiness
Allahverdi A., Aydilek H.
JOURNAL OF INTELLIGENT MANUFACTURING
, sa.2, ss.225-237, 2015 (SCI-Expanded, Scopus)
2015
201535. Total tardiness performance in m-machine no-wait flowshops with separate setup times
Aldowaisan T., ALLAHVERDİ A.
Intelligent Control and Automation , cilt.6, ss.38-44, 2015 (Hakemli Dergi)
2015
201536. Assessment of student outcomes of the Industrial and Management Systems Engineering programme at Kuwait University
Allahverdi A., Aldowaisan T.
Global Journal of Engineering Education
, cilt.17, sa.3, ss.103-112, 2015 (Scopus)
2015
201537. A unique and effective way of teaching a capstone/senior design course
Allahverdi A.
Global Journal of Engineering Education
, cilt.17, sa.3, ss.132-137, 2015 (Scopus)
2015
201538. Assigning patients to rooms in a private hospital in Kuwait
Alsabah H., Aldaihani M., ALLAHVERDİ A.
INTERNATIONAL JOURNAL OF SERVICES AND OPERATIONS MANAGEMENT
, cilt.22, ss.304-322, 2015 (Scopus)
2015
201539. No-wait flowshops to minimize total tardiness with setup times
Aldowaisan T., ALLAHVERDİ A.
Intelligent Control and Automation , cilt.6, ss.38-44, 2015 (Hakemli Dergi)
2014
201440. Single machine scheduling problem with interval processing times to minimize mean weighted completion time
Allahverdi A., Aydilek H., Aydilek A.
COMPUTERS & OPERATIONS RESEARCH
, ss.200-207, 2014 (SCI-Expanded, Scopus)
2014
201441. Total completion time with makespan constraint in no-wait flowshops with setup times
Allahverdi A., Aydilek H.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
, sa.3, ss.724-734, 2014 (SCI-Expanded, Scopus)
2013
201342. An artificial immune system heuristic for two-stage multi-machine assembly scheduling problem to minimize total completion time
Al-Anzi F. S., Allahverdi A.
JOURNAL OF MANUFACTURING SYSTEMS
, sa.4, ss.825-830, 2013 (SCI-Expanded, Scopus)
2013
201343. Algorithms for no-wait flowshops with total completion time subject to makespan
Allahverdi A., Aydilek H.
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY
, sa.9-12, ss.2237-2251, 2013 (SCI-Expanded, Scopus)
2013
201344. A polynomial time heuristic for the two-machine flowshop scheduling problem with setup times and random processing times
Aydilek H., Allahverdi A.
APPLIED MATHEMATICAL MODELLING
, sa.12-13, ss.7164-7173, 2013 (SCI-Expanded, Scopus)
2013
201345. Editorial
Allahverdi A., Ruiz R., Framinan J. M.
European Journal of Industrial Engineering
, cilt.7, sa.1, ss.1, 2013 (SCI-Expanded, Scopus)
2013
201346. Untitled
ALLAHVERDİ A., Ruiz R., Framinan J. M.
EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING
, sa.1, ss.1, 2013 (SCI-Expanded, Scopus)
2013
201347. New heuristics for no-wait flowshops with performance measures of makespan and mean completion time
Aydilek H., ALLAHVERDİ A.
International Journal of Operations Research , cilt.10, ss.29-37, 2013 (Hakemli Dergi)
2013
201348. Increasing the profitability and competitiveness in a production environment with random and bounded setup times
Aydilek A., Aydilek H., Allahverdi A.
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
, sa.1, ss.106-117, 2013 (SCI-Expanded, SSCI, Scopus)
2012
201249. Heuristics for no-wait flowshops with makespan subject to mean completion time
Aydilek H., Allahverdi A.
APPLIED MATHEMATICS AND COMPUTATION
, sa.1, ss.351-359, 2012 (SCI-Expanded, Scopus)
2012
201250. MINIMIZING TOTAL TARDINESS IN NO-WAIT FLOWSHOPS
Aldowaisan T., ALLAHVERDİ A.
FOUNDATIONS OF COMPUTING AND DECISION SCIENCES
, sa.3, ss.149-162, 2012 (ESCI, Scopus)
2012
201251. No-wait flowshop scheduling problem to minimize the number of tardy jobs
Aldowaisan T. A., Allahverdi A.
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY
, sa.1-4, ss.311-323, 2012 (SCI-Expanded, Scopus)
2012
201252. Minimizing the total completion time in a two-machine flowshop with sequence-independent setup times
Ladhari T., Msakni M., Allahverdi A.
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY
, sa.4, ss.445-459, 2012 (SCI-Expanded, SSCI, Scopus)
2012
201253. Better heuristics for a two-stage multi-machine assembly scheduling problem to minimize total completion time
AL-Anzi F., ALLAHVERDİ A.
International Journal of Operations Research , cilt.9, ss.66-75, 2012 (Hakemli Dergi)
2011
201154. IMECS 2011 - International MultiConference of Engineers and Computer Scientists 2011: Preface
Abdelkader Y. H., Ait-Kadi D., Al-Najjar B., Allahverdi A., Amavasai B. P., Henggeler C., et al.
IMECS 2011 - International MultiConference of Engineers and Computer Scientists 2011
, cilt.2, 2011 (Scopus)
2010
201055. Untitled
ALLAHVERDİ A., Ruiz R., Framinan J. M.
EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING
, cilt.138, sa.1, ss.752-1, 2010 (SCI-Expanded, Scopus)
2010
201056. Heuristics for the two-machine flowshop scheduling problem to minimize maximum lateness with bounded processing times
Allahverdi A., Aydilek H.
COMPUTERS & MATHEMATICS WITH APPLICATIONS
, sa.5, ss.1374-1384, 2010 (SCI-Expanded, Scopus)
2010
201057. Two-machine flowshop scheduling problem with bounded processing times to minimize total completion time
Aydilek H., Allahverdi A.
COMPUTERS & MATHEMATICS WITH APPLICATIONS
, sa.2, ss.684-693, 2010 (SCI-Expanded, Scopus)
2010
201058. Weighted Multi-Skill Resources Project Scheduling
AL-Anzi F., Al-Zamel K., ALLAHVERDİ A.
Journal of Software Engineering and Applications , cilt.3, ss.1125, 2010 (Hakemli Dergi)
2010
201059. Heuristics for the two-machine flowshop scheduling problem to minimise makespan with bounded processing times
Allahverdi A., Aydilek H.
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
, sa.21, ss.6367-6385, 2010 (SCI-Expanded, Scopus)
2009
200960. The two-stage assembly scheduling problem to minimize total completion time with setup times
Allahverdi A., Al-Anzi F. S.
COMPUTERS & OPERATIONS RESEARCH
, sa.10, ss.2740-2747, 2009 (SCI-Expanded, Scopus)
2009
200961. Heuristics for a two-stage assembly flowshop with bicriteria of maximum lateness and makespan
Al-Anzi F. S., Allahverdi A.
COMPUTERS & OPERATIONS RESEARCH
, sa.9, ss.2682-2689, 2009 (SCI-Expanded, Scopus)
2009
200962. Minimizing the bicriteria of makespan and maximum tardiness with an upper bound on maximum tardiness
Ruiz R., Allahverdi A.
COMPUTERS & OPERATIONS RESEARCH
, sa.4, ss.1268-1283, 2009 (SCI-Expanded, Scopus)
2009
200963. New heuristics for no-wait flow shops with a linear combination of makespan and maximum lateness
Ruiz R., Allahverdi A.
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
, sa.20, ss.5717-5738, 2009 (SCI-Expanded, SSCI, Scopus)
2009
200964. Three-machine flowshop scheduling problem to minimize maximum lateness with bounded setup and processing times
ALLAHVERDİ A.
Journal of Operations and Logistics , cilt.2, ss.1-11, 2009 (Hakemli Dergi)
2009
200965. Permutation flow shops with exact time lags to minimise maximum lateness
Fondrevelle J., Oulamara A., Portmann M., Allahverdi A.
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
, sa.23, ss.6759-6775, 2009 (SCI-Expanded, Scopus)
2009
200966. Optimising a help desk performance at a telecommunication company
Abdulmalek F., ALLAHVERDİ A.
INTERNATIONAL JOURNAL OF ENGINEERING SYSTEMS MODELLING AND SIMULATION
, sa.2-3, ss.160-164, 2009 (ESCI)
2008
200867. The significance of reducing setup times/setup costs
Allahverdi A., Soroush H.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
, sa.3, ss.978-984, 2008 (SCI-Expanded, Scopus)
2008
200868. A survey of scheduling problems with setup times or costs
Allahverdi A., Ng C., Cheng T., Kovalyov M. Y.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
, sa.3, ss.985-1032, 2008 (SCI-Expanded, Scopus)
2008
200869. The two-stage assembly flowshop scheduling problem with bicriteria of makespan and mean completion time
Allahverdi A., Al-Anzi F. S.
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY
, sa.1-2, ss.166-177, 2008 (SCI-Expanded, Scopus)
2008
200870. THREE-MACHINE FLOWSHOP SCHEDULING PROBLEM TO MINIMIZE MAKESPAN WITH BOUNDED SETUP AND PROCESSING TIMES
ALLAHVERDİ A.
JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING
, sa.1, ss.52-61, 2008 (ESCI)
2008
200871. Untitled
ALLAHVERDİ A., Ruiz R., Framinan J. M.
EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING
, sa.1, 2008 (SCI-Expanded, Scopus)
2008
200872. Senior design course in industrial engineering at Kuwait University
Savasar M., ALLAHVERDİ A.
INTERNATIONAL JOURNAL OF CONTINUING ENGINEERING EDUCATION AND LIFE-LONG LEARNING
, sa.2, ss.253-263, 2008 (ESCI, Scopus)
2007
200773. No-wait flowshop with separate setup times to minimize maximum lateness
Ruiz R., Allahverdi A.
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY
, sa.5-6, ss.551-565, 2007 (SCI-Expanded, SSCI, Scopus)
2007
200774. Some effective heuristics for no-wait flowshops with setup times to minimize total completion time
Ruiz R., Allahverdi A.
ANNALS OF OPERATIONS RESEARCH
, sa.1, ss.143-171, 2007 (SCI-Expanded, Scopus)
2007
200775. Batching deteriorating items with applications in computer communication and reverse logistics
Al-Anzi F. S., Allahverdi A., Kovalyov M. Y.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
, sa.3, ss.1002-1011, 2007 (SCI-Expanded, Scopus)
2007
200776. A self-adaptive differential evolution heuristic for two-stage assembly scheduling problem to minimize maximum lateness with setup times
Al-Anzi F. S., Allahverdi A.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
, sa.1, ss.80-94, 2007 (SCI-Expanded, Scopus)
2007
200777. Three-machine flowshop scheduling problem to minimize total completion time with bounded setup and processing times
ALLAHVERDİ A.
Decision making in manufacturing and services , cilt.1, ss.5-23, 2007 (Hakemli Dergi)
2007
200778. The three-machine flowshop scheduling problem to minimise maximum lateness with separate setup times
Ng C., ALLAHVERDİ A., AL-Anzi F., Cheng T.
INTERNATIONAL JOURNAL OF OPERATIONAL RESEARCH
, cilt.2, ss.135-155, 2007 (Scopus)
2007
200779. Untitled
ALLAHVERDİ A., Ruiz R., Framinan J. M.
EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING
, sa.1, ss.1-4, 2007 (SCI-Expanded)
2006
200680. Two-machine flowshop scheduling problem to minimize maximum lateness with bounded setup and processing times
ALLAHVERDİ A.
KUWAIT JOURNAL OF SCIENCE & ENGINEERING
, sa.2, ss.233-252, 2006 (SCI-Expanded)
2006
200681. Evolutionary heuristics and an algorithm for the two-stage assembly scheduling problem to minimize makespan with setup times
Allahverdi A., Al-Anzi F. S.
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
, sa.22, ss.4713-4735, 2006 (SCI-Expanded, Scopus)
2006
200682. Empirically discovering dominance relations for scheduling problems using an evolutionary algorithm
Al-Anzi F., Allahverdi A.
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
, sa.22, ss.4701-4712, 2006 (SCI-Expanded, Scopus)
2006
200683. Using mixed graph coloring to minimize total completion time in job shop scheduling
Al-Anzi F. S., Sotskov Y. N., Allahverdi A., Andreev G. V.
APPLIED MATHEMATICS AND COMPUTATION
, sa.2, ss.1137-1148, 2006 (SCI-Expanded, Scopus)
2006
200684. Two-machine flowshop scheduling problem to minimize total completion time with bounded setup and processing times
Allahverdi A.
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS
, sa.1, ss.386-400, 2006 (SCI-Expanded, Scopus)
2006
200685. A PSO and a Tabu search heuristics for the assembly scheduling problem of the two-stage distributed database application
Allahverdi A., Al-Anzi F. S.
COMPUTERS & OPERATIONS RESEARCH
, sa.4, ss.1056-1080, 2006 (SCI-Expanded, Scopus)
2006
200686. A branch-and-bound algorithm for three-machine flowshop scheduling problem to minimize total completion time with separate setup times
Allahverdi A., Al-Anzi F. S.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
, sa.3, ss.767-780, 2006 (SCI-Expanded, Scopus)
2006
200687. A hybrid tabu search heuristic for the two-stage assembly scheduling problem
AL-Anzi F., ALLAHVERDİ A.
International Journal of Operations Research , cilt.3, ss.109-119, 2006 (Hakemli Dergi)
2006
200688. Economic order quantity with uncertain inflation: A case study
Zeydan M., Allahverdi A.
International Journal of Industrial Engineering : Theory Applications and Practice
, cilt.13, sa.3, ss.320-327, 2006 (SCI-Expanded, Scopus)
2006
200689. Scheduling multi-stage parallel-processor services to minimize average response time
Allahverdi A., Al-Anzi F.
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY
, sa.1, ss.101-110, 2006 (SCI-Expanded, SSCI, Scopus)
2005
200590. Two-machine flowshop scheduling problem to minimize makespan with bounded set-up and processing times
Allahverdi A.
International Journal of Agile Manufacturing
, cilt.8, sa.2, ss.145-153, 2005 (Scopus)
2005
200591. Two-machine, no-wait flowshop scheduling problem to minimize maximum lateness with separate set-up and removal times
Fondrevelle J., Allahverdi A., Oulamara A.
International Journal of Agile Manufacturing
, cilt.8, sa.2, ss.165-174, 2005 (Scopus)
2005
200592. Three-machine flowshop scheduling to minimize maximum lateness
Allahverdi A.
International Journal of Agile Manufacturing
, cilt.8, sa.2, ss.155-163, 2005 (Scopus)
2005
200593. Using a Hybrid Evolutionary Algorithm to Minimize Variance in Response Time for Multimedia Object Requests
AL-Anzi F., ALLAHVERDİ A.
JOURNAL OF MATHEMATICAL MODELLING AND ALGORITHMS
, cilt.4, ss.435-453, 2005 (Scopus)
2005
200594. Stochastic two-machine flowshop scheduling problem with total completion time criterion
Soroush H., ALLAHVERDİ A.
INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE
, sa.2, ss.159-171, 2005 (SCI-Expanded, Scopus)
2005
200595. A polynomial genetic based algorithm to minimize maximum lateness in a two-stage flowshop with setup times
ALLAHVERDİ A., AL-Anzi F., Gupta J.
International Journal of Operations Research , cilt.2, ss.89-100, 2005 (Hakemli Dergi)
2005
200596. Two-machine flowshop scheduling problem to minimize makespan with bounded setup and processing times
ALLAHVERDİ A.
International Journal of Agile Manufacturing , cilt.8, ss.145-153, 2005 (Hakemli Dergi)
2004
200497. New heuristics for m-machine no-wait flowshop to minimize total completion time
Aldowaisan T., Allahverdi A.
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE
, sa.5, ss.345-352, 2004 (SCI-Expanded, SSCI, Scopus)
2004
200498. Three-machine no-wait flowshop with separate setup and removal times to minimize total completion time
Aldowaisan T., ALLAHVERDİ A.
INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE
, sa.2, ss.113-123, 2004 (SCI-Expanded, Scopus)
2004
200499. Flowshop scheduling problem to minimize total completion time with random and bounded processing times
Sotskov Y., Allahverdi A., Lai T.
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY
, sa.3, ss.277-286, 2004 (SCI-Expanded, SSCI, Scopus)
2004
2004100. A new heuristic for m-machine flowshop scheduling problem with bicriteria of makespan and maximum tardiness
Allahverdi A.
COMPUTERS & OPERATIONS RESEARCH
, sa.2, ss.157-180, 2004 (SCI-Expanded, Scopus)
2004
2004101. A Hybrid Simulated Annealing Heuristic for Multimedia Object Requests Scheduling Problem
AL-Anzi F., ALLAHVERDİ A.
INTERNATIONAL JOURNAL OF COMPUTERS AND APPLICATIONS
, cilt.26, ss.1-6, 2004 (Scopus)
2004
2004102. Stochastically minimizing makespan on a three-machine flowshop
ALLAHVERDİ A.
INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE
, cilt.11, sa.2, ss.124-131, 2004 (SCI-Expanded, Scopus)
2004
2004103. No-wait flowshops with bicriteria of makespan and maximum lateness
Allahverdi A., Aldowaisan T.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
, sa.1, ss.132-147, 2004 (SCI-Expanded, Scopus)
2004
2004104. A branch-and-bound algorithm for the three-machine flowshop scheduling problem with bicriteria of makespan andtotal flowtime
Yeh W., Allahverdi A.
International Transactions in Operational Research
, cilt.11, sa.3, ss.323-339, 2004 (Scopus)
2003
2003105. Optimal selection of module instances for modular products in reconfigurable manufacturing systems
YİĞİT A. S., Allahverdi A.
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
, sa.17, ss.4063-4074, 2003 (SCI-Expanded, Scopus)
2003
2003106. New heuristics for no-wait flowshops to minimize makespan
Aldowaisan T., Allahverdi A.
COMPUTERS & OPERATIONS RESEARCH
, sa.8, ss.1219-1231, 2003 (SCI-Expanded, Scopus)
2003
2003107. The two- and m-machine flowshop scheduling problems with bicriteria of makespan and mean flowtime
Allahverdi A.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
, sa.2, ss.373-396, 2003 (SCI-Expanded, Scopus)
2003
2003108. Two-machine flowshop minimum-length scheduling problem with random and bounded processing times
Allahverdi A., Sotskov Y.
International Transactions in Operational Research
, cilt.10, sa.1, ss.65-76, 2003 (Scopus)
2003
2003109. Two-machine flowshop scheduling problem to minimize makespan or total completion time with random and bounded setup times
Allahverdi A., Aldowaisan T., Sotskov Y. N.
International Journal of Mathematics and Mathematical Sciences
, cilt.2003, sa.39, ss.2475-2486, 2003 (Scopus)
2002
2002110. Two-machine flowshop scheduling to minimize total completion time with separate setup and removal times
ALLAHVERDİ A., Aldowaisan T.
INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE
, sa.3, ss.275-286, 2002 (SCI-Expanded, Scopus)
2002
2002111. Scheduling on three serial duplicate stations in assembly lines with multiple criteria
ALLAHVERDİ A., Savsar M.
INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE
, sa.3, ss.265-274, 2002 (SCI-Expanded, Scopus)
2002
2002112. No-wait flowshops with bicriteria of makespan and total completion time
Allahverdi A., Aldowaisan T.
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY
, sa.9, ss.1004-1015, 2002 (SCI-Expanded, SSCI, Scopus)
2002
2002113. Optimizing modular product design for reconfigurable manufacturing
YİĞİT A. S., Ulsoy A. G., Allahverdi A.
JOURNAL OF INTELLIGENT MANUFACTURING
, sa.4, ss.309-316, 2002 (SCI-Expanded, Scopus)
2002
2002114. Using two-machine flowshop with maximum lateness objective to model multimedia data objects scheduling problem for WWW applications
Allahverdi A., Al-Anzi F. S.
COMPUTERS & OPERATIONS RESEARCH
, sa.8, ss.971-994, 2002 (SCI-Expanded, Scopus)
2002
2002115. New heuristics to minimize total completion time in m-machine flowshops
Allahverdi A., Aldowaisan T.
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS
, sa.1, ss.71-83, 2002 (SCI-Expanded, Scopus)
2002
2002116. Flexible multistage parallel-server scheduling for Internet service architecture
AL-Anzi F., ALLAHVERDİ A.
INTERNATIONAL JOURNAL OF PARALLEL AND DISTRIBUTED SYSTEMS AND NETWORKS
, cilt.5, ss.134-142, 2002 (Scopus)
2001
2001117. Minimizing total completion time in a no-wait flowshop with sequence-dependent additive changeover times
Allahverdi A., Aldowaisan T.
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY
, sa.4, ss.449-462, 2001 (SCI-Expanded, SSCI, Scopus)
2001
2001118. Stochastic proportionate flowshop scheduling with setups
Allahverdi A., Savsar M.
COMPUTERS & INDUSTRIAL ENGINEERING
, sa.3-4, ss.357-369, 2001 (SCI-Expanded, Scopus)
2001
2001119. The Tricriteria Two-Machine Flowshop Scheduling Problem
Allahverdi A.
International Transactions in Operational Research
, cilt.8, sa.4, ss.403-425, 2001 (Scopus)
2001
2001120. The relationship between three-tiered client-server internet database connectivity and two-machine flowshop
AL-Anzi F., ALLAHVERDİ A.
International Journal of Parallel and Distributed Systems and Networks
, cilt.4, ss.94-101, 2001 (Scopus)
2000
2000121. Minimizing mean flowtime in a two-machine flowshop with sequence-independent setup times
Allahverdi A.
COMPUTERS & OPERATIONS RESEARCH
, sa.2, ss.111-127, 2000 (SCI-Expanded, SSCI, Scopus)
2000
2000122. No-wait and separate setup three-machine flowshop with total completion time criterion
Allahverdi A., Aldowaisan T.
International Transactions in Operational Research
, cilt.7, sa.3, ss.245-264, 2000 (Scopus)
1999
1999123. A review of scheduling research involving setup considerations
Allahverdi A., Gupta J. N., Aldowaisan T.
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE
, sa.2, ss.219-239, 1999 (SCI-Expanded, SSCI, Scopus)
1999
1999124. Stochastically minimizing total flowtime in flowshops with no waiting space
Allahverdi A.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
, sa.1, ss.101-112, 1999 (SCI-Expanded, Scopus)
1999
1999125. Algorithms for scheduling jobs on two serial duplicate stations
Savsar M., Allahverdi A.
International Transactions in Operational Research
, cilt.6, sa.4, ss.411-422, 1999 (Scopus)
1998
1998126. Total flowtime in no-wait flowshops with separated setup times
Aldowaisan T., Allahverdi A.
COMPUTERS & OPERATIONS RESEARCH
, sa.9, ss.757-765, 1998 (SCI-Expanded, Scopus)
1998
1998127. Job lateness in flowshops with setup and removal times separated
ALLAHVERDİ A., Aldowaisan T.
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY
, sa.9, ss.1001-1006, 1998 (SCI-Expanded, SSCI, Scopus)
1998
1998128. Dual criteria scheduling on a two-machine flowshop subject to random breakdowns
Allahverdi A.
INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH , cilt.5, ss.317-327, 1998 (Hakemli Dergi)
1997
1997129. Scheduling in stochastic flowshops with independent setup, processing and removal times
Allahverdi A.
COMPUTERS & OPERATIONS RESEARCH
, sa.10, ss.955-960, 1997 (SCI-Expanded, Scopus)
1997
1997130. Stochastic machine dominance in flowshops
Allahverdi A., Fatih Tatari M.
COMPUTERS & INDUSTRIAL ENGINEERING
, sa.4, ss.735-741, 1997 (SCI-Expanded, Scopus)
1996
1996131. Two-machine proportionate flowshop scheduling with breakdowns to minimize maximum lateness
Allahverdi A.
COMPUTERS & OPERATIONS RESEARCH
, sa.10, ss.909-916, 1996 (SCI-Expanded, Scopus)
1996
1996132. Simulation of different rules in stochastic flowshops
Allahverdi A., Tatari M. F.
COMPUTERS & INDUSTRIAL ENGINEERING
, sa.1-2, ss.209-212, 1996 (SCI-Expanded, Scopus)
1996
1996133. Stochastic scheduling and dynamic programming - Koole,GM
ALLAHVERDİ A.
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY
, sa.10, ss.1313-1314, 1996 (SCI-Expanded, SSCI, Scopus)
1995
1995134. 2-STAGE PRODUCTION SCHEDULING WITH SEPARATED SET-UP TIMES AND STOCHASTIC BREAKDOWNS
ALLAHVERDİ A.
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY
, sa.7, ss.896-904, 1995 (SCI-Expanded, SSCI, Scopus)
1995
1995135. SCHEDULING ON A 2-MACHINE FLOWSHOP SUBJECT TO RANDOM BREAKDOWNS WITH A MAKESPAN OBJECTIVE FUNCTION
Allahverdi A., Mittenthal J.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
, sa.2, ss.376-387, 1995 (SSCI, Scopus)
1994
1994136. SCHEDULING ON M PARALLEL MACHINES SUBJECT TO RANDOM BREAKDOWNS TO MINIMIZE EXPECTED MEAN FLOW TIME
ALLAHVERDİ A., MITTENTHAL J.
NAVAL RESEARCH LOGISTICS
, sa.5, ss.677-682, 1994 (SCI-Expanded, Scopus)
1994
1994137. 2-MACHINE ORDERED FLOWSHOP SCHEDULING UNDER RANDOM BREAKDOWNS
Allahverdi A., Mittenthal J.
MATHEMATICAL AND COMPUTER MODELLING
, sa.2, ss.9-17, 1994 (SCI-Expanded)
1994
1994138. Optimal Policies for a Deterministic Two-Machine Semi-ordered Flowshop with Maximum Lateness Objective
ALLAHVERDİ A.
INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH , cilt.6, ss.47-54, 1994 (Scopus)
1992
1992139. ROBUST ESTIMATION METHODS FOR EXPONENTIAL DATA - A MONTE-CARLO COMPARISON
Willemain T. R., Allahverdi A., DeSautels P., Eldredge J., Gur O., Miller M., et al.
COMMUNICATIONS IN STATISTICS-SIMULATION AND COMPUTATION
, sa.4, ss.1043-1075, 1992 (SCI-Expanded, Scopus)
Hakemli Bilimsel Toplantılarda Yayımlanmış Bildiriler
2023
20231. Scheduling on a three-machine flowshop with uncertain processing times to minimize makespan
ALLAHVERDİ A., Allahverdi M.
Kuala Lumpur, Malaysia, 3rd International Virtual Conference on Education, Social Sciences and Technology, Kuala-Lumpur, Malezya, 12 Ağustos 2023, (Tam Metin Bildiri)
2022
20222. Scheduling Problems with Bounded Processing or Setup Times
ALLAHVERDİ A.
Kuala, Lumpur, Malaysiam, 3rd International Multidisciplinary Conference on Education, Engineering and Social Sciences, Kuala-Lumpur, Malezya, 26 Kasım 2022, (Tam Metin Bildiri)
2021
20213. Minimizing total completion time for stochastic flowshops
Allahverdi M., ALLAHVERDİ A.
Istanbul, Turkiye, 4th International E-Conference on Mathematical Advances and Applications, İstanbul, Türkiye, 26 Mayıs 2021, (Tam Metin Bildiri)
2021
20214. Four-machine flowshop scheduling problem with uncertain processing times to minimize mean completion time
Allahverdi M., ALLAHVERDİ A.
Kuala Lumpur, Malaysia, International E-Conference on Applied Sciences, Society, and Economics, Kuala-Lumpur, Malezya, 04 Mayıs 2021, (Tam Metin Bildiri)
2018
20185. Minimizing makespan in flowshops with bounded processing times
Allahverdi M., ALLAHVERDİ A.
Sanliurfa, Turkey, VI. International GAP Engineering Conference, Türkiye, 08 Kasım 2018, (Tam Metin Bildiri)
2018
20186. Minimizing mean completion time for bounded processing times in flowshops
Allahverdi M., ALLAHVERDİ A.
Sanliurfa, Turkey, VI. International GAP Engineering Conference, Türkiye, 08 Kasım 2018, (Tam Metin Bildiri)
2018
20187. The two-machine no-wait flowshop problem with uncertain setup times
ALLAHVERDİ A., Allahverdi M.
Tokat, Turkey, International Conference on Contemporary Issues in Business & Economics, Türkiye, 14 Temmuz 2018, (Tam Metin Bildiri)
2018
20188. Minimizing mean completion time for a two-machine no-wait flowshop scheduling problem
Allahverdi M., ALLAHVERDİ A.
Tokat, Turkey, International Conference on Contemporary Issues in Business & Economics, Türkiye, 14 Temmuz 2018, (Tam Metin Bildiri)
2014
20149. Minimizing total completion time in no-wait flowshops with setup times
ALLAHVERDİ A., Aydilek H.
New York, USA, International Conference on Industrial Electronics and Systems Engineering, Amerika Birleşik Devletleri, 05 Haziran 2014, (Tam Metin Bildiri)
2012
201210. A new heuristic for the queries scheduling problem on distributed database systems to minimize mean completion time
Allahverdi A., Al-Anzi F. S.
21st International Conference on Software Engineering and Data Engineering, SEDE 2012, Los Angeles, CA, Amerika Birleşik Devletleri, 27 - 29 Haziran 2012, ss.93-97, (Tam Metin Bildiri)
2012
201211. Assembly flowshop scheduling problem to minimize total tardiness
ALLAHVERDİ A., Aydilek H.
Harvard, Cambridge, USA, American Conference on Applied Mathematics, Amerika Birleşik Devletleri, 25 Ocak 2012, (Tam Metin Bildiri)
2010
201012. Project scheduling problem with weighted multi-skill resources: Enhancing the effeciancy of project scheduling
Al-Anzi F. S., Al-Zamel K., Allahverdi A.
2010 International Conference on Computational Intelligence and Software Engineering, CiSE 2010, Wuhan, Çin, 10 - 12 Aralık 2010, (Tam Metin Bildiri)
2009
200913. Heuristic Algorithms for Minimizing Total Completion Time in a Two-Machine Flowshop with Sequence-Independent Setup
Msakni M., Ladhari T., ALLAHVERDİ A.
Troyes, France, 39th International Conference on Computers & Industrial Engineering, Fransa, 06 Haziran 2009, (Tam Metin Bildiri)
2009
200914. Heuristic algorithms for minimizing total completion time in a two-machineflowshop with sequence-independent setup times
Msakni M. K., Ladhari T., Allahverdi A.
2009 International Conference on Computers and Industrial Engineering, CIE 2009, Troyes, Fransa, 6 - 09 Temmuz 2009, ss.90-95, (Tam Metin Bildiri)
2008
200815. Two-stage assembly flowshop scheduling problem with maximum lateness and makespan
Allahverdi A., Al-Anzi F. S.
38th International Conference on Computers and Industrial Engineering 2008, Beijing, Çin, 31 Ekim - 02 Kasım 2008, cilt.2, ss.2021-2028, (Tam Metin Bildiri)
2008
200816. The two-stage assembly flowshop scheduling problem with setup times
Allahverdi A., Al-Anzi F. S.
38th International Conference on Computers and Industrial Engineering 2008, Beijing, Çin, 31 Ekim - 02 Kasım 2008, cilt.2, ss.2029-2035, (Tam Metin Bildiri)
2008
200817. Two-Stage Assembly Flowshop Scheduling Problem with Setup Times
ALLAHVERDİ A., AL-Anzi F.
Sakarya, Turkey, Sixth International Symposium on Intelligent Manufacturing Systems, Türkiye, 14 Ekim 2008, (Tam Metin Bildiri)
2008
200818. Minimization of makespan and maximum tardiness subject to a maximum tardiness bound in flowshop problems
Ruiz R., ALLAHVERDİ A.
Istanbul, Turkey,Eleventh Inte rnational Workshop on Project Management and Scheduling, Türkiye, 28 Nisan 2008, (Tam Metin Bildiri)
2007
200719. Three-Machine Flowshop Scheduling Problem to Minimize Total Completion Time with Bounded Setup and Processing Times
ALLAHVERDİ A.
Melaka, Malaysia, International Conference on Engineering & ICT: Meeting the Challenges of Advanced Manufacturing, Malezya, 27 Kasım 2007, (Tam Metin Bildiri)
2007
200720. Senior design course in Industrial Engineering at Kuwait University
Savasar M., ALLAHVERDİ A.
Kuwait, Second International Conference on Engineering Education and Training, Kuveyt, 09 Nisan 2007, (Tam Metin Bildiri)
2006
200621. Assembly scheduling problem to minimize maximum lateness
ALLAHVERDİ A., AL-Anzi F.
Hammamet, Tunisia, Third International Conference on Advances in Mechanical Engineering and Mechanics, Tunus, 17 Aralık 2006, (Tam Metin Bildiri)
2006
200622. Fast genetic algorithms for lateness minimization no-wait flowshop with setup times
Ruiz R., ALLAHVERDİ A.
Iceland, 21st European Conference on Operational Research, İzlanda, 02 Temmuz 2006, (Özet Bildiri)
2006
200623. Two-stage assembly scheduling problem to minimize makespan with setup times
ALLAHVERDİ A.
Poznan, Poland, Tenth International Workshop on Project Management and Scheduling, Polonya, 26 Nisan 2006, (Tam Metin Bildiri)
2006
200624. Stochastic local search methods for no-wait flowshops with sequence independent setup times
Ruiz R., ALLAHVERDİ A.
Poznan, Poland, Tenth International Workshop on Project Management and Scheduling, Polonya, 26 Nisan 2006, (Tam Metin Bildiri)
2006
200625. Computer assembly scheduling problem
Ai-Anzi F. S., Allahverdi A.
ICSSSM'06: 2006 International Conference on Service Systems and Service Management, Troyes, Fransa, 25 - 27 Ekim 2006, cilt.2, ss.1188-1191, (Tam Metin Bildiri)
2005
200526. Minimizing makespan on a two-machine flowshop with unknown setup and processing times
ALLAHVERDİ A.
Marrakech, Morocco, International Conference on Industrial Engineering and Systems Management, Fas, 16 Mayıs 2005, (Tam Metin Bildiri)
2005
200527. A new tabu search heuristic for the two-stage assembly scheduling problem
AL-Anzi F., ALLAHVERDİ A.
Marrakech, Morocco, International Conference on Industrial Engineering and Systems Management, Fas, 16 Mayıs 2005, (Tam Metin Bildiri)
2004
200428. Scheduling problem with random processing times to minimize total completion time
ALLAHVERDİ A., Sotskov Y.
Kuwait, International Mechanical Engineering Conference, Kuveyt, 05 Aralık 2004, (Tam Metin Bildiri)
2004
200429. A genetic algorithm for experimental dominance relations in scheduling problems
AL-Anzi F., ALLAHVERDİ A.
Kuwait, International Mechanical Engineering Conference, Kuveyt, 05 Aralık 2004, (Tam Metin Bildiri)
2004
200430. The two-stage assembly flowshop scheduling problem
ALLAHVERDİ A., AL-Anzi F.
Kuwait, International Mechanical Engineering Conference, Kuveyt, 05 Aralık 2004, (Tam Metin Bildiri)
2004
200431. Heuristics for the two-stage assembly scheduling problem
ALLAHVERDİ A., AL-Anzi F.
Sakarya, Turkey, Fourth International Symposium on Intelligent Manufacturing Systems, Türkiye, 06 Eylül 2004, (Tam Metin Bildiri)
2004
200432. An evolutionary algorithm for empirical dominance relations in scheduling problems
AL-Anzi F., ALLAHVERDİ A.
Sakarya, Turkey, Fourth International Symposium on Intelligent Manufacturing Systems, Türkiye, 06 Eylül 2004, (Tam Metin Bildiri)
2004
200433. Three-Site Distributed Database Scheduling Problem
ALLAHVERDİ A., AL-Anzi F.
Nancy, France, Ninth International Workshop on Project Management and Scheduling, Fransa, 26 Nisan 2004, (Tam Metin Bildiri)
2004
200434. Empirically Discovering Dominance Relations for Scheduling Problems
AL-Anzi F., ALLAHVERDİ A.
Nancy, France, Ninth International Workshop on Project Management and Scheduling, Fransa, 26 Nisan 2004, (Tam Metin Bildiri)
2003
200335. Scheduling requests on multi-stage multi-server to increase quality of service
Allahverdi A., Al-Anzi F. S.
IFIP TC6 / WG6.2 and WG6.7 2nd International Conference on Network Control and Engineering for QoS, Security and Mobility, Net-Con 2003, Muscat, Umman, 13 - 15 Ekim 2003, cilt.133, ss.14-25, (Tam Metin Bildiri)
2002
200236. Minimizing average service time in flexible multi-server internet architecture
AL-Anzi F., ALLAHVERDİ A.
Miedzyzdroje, Poland, Ninth International Multi-Conference of Advanced Computer Systems on Production System Design, Supply Chain Management and Logistics, Polonya, 23 Ekim 2002, (Tam Metin Bildiri)
2002
200237. Multimedia object requests scheduling for minimizing Variance of Response Time
ALLAHVERDİ A., AL-Anzi F.
Miedzyzdroje, Poland, Ninth International Multi-Conference of Advanced Computer Systems on Production System Design, Supply Chain Management and Logistics, Polonya, 23 Ekim 2002, (Tam Metin Bildiri)
2002
200238. No-wait flowshop scheduling with multi-criteria
ALLAHVERDİ A., Aldowaisan T.
Valencia, Spain, Eighth International Workshop on Project Management and Scheduling, İspanya, 03 Nisan 2002, (Tam Metin Bildiri)
2002
200239. Multimedia Objects Scheduling in WWW to Minimize Completion Time Variance
AL-Anzi F., ALLAHVERDİ A.
Valencia, Spain, Eighth International Workshop on Project Management and Scheduling, İspanya, 03 Nisan 2002, (Tam Metin Bildiri)
2002
200240. Flowshop scheduling with random and bounded setup times
ALLAHVERDİ A., Aldowaisan T., Sotskov Y.
Valencia, Spain, Eighth International Workshop on Project Management and Scheduling, İspanya, 03 Nisan 2002, (Tam Metin Bildiri)
2001
200141. Scheduling on Assembly Lines with Serial Duplicate Stations
Savasar M., ALLAHVERDİ A.
Amman, Jordan, First International Industrial Engineering Conference, IIEC 2001, Ürdün, 23 Eylül 2001, (Tam Metin Bildiri)
2001
200142. Bicriteria scheduling on an m-machine no-wait flowshop
ALLAHVERDİ A., Aldowaisan T.
Amman, Jordan, First International Industrial Engineering Conference, IIEC 2001, Ürdün, 23 Eylül 2001, (Tam Metin Bildiri)
2001
200143. Two-machine flowshop scheduling with bounded processing times
Sotskov Y., ALLAHVERDİ A.
Aussois, France, Fourth Workshop on Models and Algorithms for Planning and Scheduling Problems, Fransa, 17 Haziran 2001, (Tam Metin Bildiri)
2001
200144. Total completion time minimization in a two or three machines flowshops with bounded processing times
Sotskov Y., ALLAHVERDİ A.
Bonn, Germany, Conference of the European Chapter on Combinatorial Optimization, ECCO XIV, Almanya, 31 Mayıs 2001, (Tam Metin Bildiri)
2000
200045. Modeling multimedia data objects allocation problem for Internet using two-machine flowshop
ALLAHVERDİ A., AL-Anzi F.
Osnabruck, Germany, Seventh International Workshop on Project Management and Scheduling, Almanya, 17 Nisan 2000, (Tam Metin Bildiri)
Bilimsel Dergilerdeki Faaliyetler
2015 - Devam Ediyor
2015 - Devam EdiyorINTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING COMPUTATIONS
Editörler Kurulu Üyesi
2013 - Devam Ediyor
2013 - Devam EdiyorOperations Research Perspectives
Editörler Kurulu Üyesi
2013 - Devam Ediyor
2013 - Devam EdiyorJOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING
Editörler Kurulu Üyesi
2008 - Devam Ediyor
2008 - Devam EdiyorINTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
Editörler Kurulu Üyesi
2006 - Devam Ediyor
2006 - Devam EdiyorEUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING
Editör
2018 - 2018
2018 - 2018INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
Özel Sayı Editörü
2004 - 2012
2004 - 2012JOURNAL OF THE CHINESE INSTITUTE OF INDUSTRIAL ENGINEERS
Editörler Kurulu Üyesi
2005 - 2011
2005 - 2011CENTRAL EUROPEAN JOURNAL OF OPERATIONS RESEARCH
Yardımcı Editör/Bölüm Editörü
2008 - 2008
2008 - 2008EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
Özel Sayı Editörü
Bilimsel Kuruluşlardaki Üyelikler / Görevler
2018 - Devam Ediyor
2018 - Devam EdiyorIndustrial Engineering and Operations Management (IEOM) Society
Asosiye Üye
2015 - Devam Ediyor
2015 - Devam EdiyorWorld Institute for Engineering and Technology Education
Üye
2005 - Devam Ediyor
2005 - Devam EdiyorIAENG (International Association of Engineers) Society of Industrial Engineers
Üye
2005 - Devam Ediyor
2005 - Devam EdiyorThe International Society of Agile Manufacturing (ISAM)
Üye
2001 - Devam Ediyor
2001 - Devam EdiyorThe Institute of Industrial Engineers
Üye
1995 - Devam Ediyor
1995 - Devam EdiyorThe Institute for Operations Research and the Management Sciences (INFORMS)
Üye
2005 - 2015
2005 - 2015The International Institute of Innovation, Industrial Engineering and Entrepreneurship
Üye
Bilimsel Yayınlarda Hakemlikler
Nisan 2023
Nisan 2023EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
SCI Kapsamındaki Dergi
Şubat 2023
Şubat 2023INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
SCI Kapsamındaki Dergi
Haziran 2021
Haziran 2021EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
SCI Kapsamındaki Dergi
Mayıs 2020
Mayıs 2020EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
SCI Kapsamındaki Dergi
Mayıs 2019
Mayıs 2019EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
SCI Kapsamındaki Dergi
Haziran 2018
Haziran 2018EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
SCI Kapsamındaki Dergi
Haziran 2017
Haziran 2017EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
SCI Kapsamındaki Dergi
Haziran 2016
Haziran 2016EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
SCI Kapsamındaki Dergi
Temmuz 2015
Temmuz 2015CENTRAL EUROPEAN JOURNAL OF OPERATIONS RESEARCH
SCI Kapsamındaki Dergi
Haziran 2015
Haziran 2015COMPUTERS & OPERATIONS RESEARCH
SCI Kapsamındaki Dergi
Ocak 2015
Ocak 2015EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
SCI Kapsamındaki Dergi
Ekim 2014
Ekim 2014JOURNAL OF MANUFACTURING SYSTEMS
SCI Kapsamındaki Dergi
Temmuz 2014
Temmuz 2014EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
SCI Kapsamındaki Dergi
Ağustos 2013
Ağustos 2013EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
SCI Kapsamındaki Dergi
Mayıs 2012
Mayıs 2012COMPUTERS & INDUSTRIAL ENGINEERING
SCI Kapsamındaki Dergi
Mart 2012
Mart 2012EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
SCI Kapsamındaki Dergi
Ekim 2011
Ekim 2011JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY
SCI Kapsamındaki Dergi
Ekim 2011
Ekim 2011INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING : THEORY APPLICATIONS AND PRACTICE
SCI Kapsamındaki Dergi
Şubat 2011
Şubat 2011EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
SCI Kapsamındaki Dergi
Aralık 2010
Aralık 2010JOURNAL OF MATHEMATICAL MODELLING AND ALGORITHMS
SCI Kapsamındaki Dergi
Ekim 2010
Ekim 2010INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS
SCI Kapsamındaki Dergi
Şubat 2010
Şubat 2010EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
SCI Kapsamındaki Dergi
Ekim 2009
Ekim 2009INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY
SCI Kapsamındaki Dergi
Ocak 2009
Ocak 2009EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
SCI Kapsamındaki Dergi
Mayıs 2008
Mayıs 2008EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
SCI Kapsamındaki Dergi
Mart 2008
Mart 2008INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH
SCI Kapsamındaki Dergi
Ekim 2007
Ekim 2007ANNALS OF OPERATIONS RESEARCH
SCI Kapsamındaki Dergi
Ocak 2007
Ocak 2007EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
SCI Kapsamındaki Dergi
Aralık 2006
Aralık 2006JOURNAL OF SCHEDULING
SCI Kapsamındaki Dergi
Ekim 2006
Ekim 2006INTERNATIONAL JOURNAL OF FLEXIBLE MANUFACTURING SYSTEMS
SCI Kapsamındaki Dergi
Şubat 2006
Şubat 2006EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
SCI Kapsamındaki Dergi
Temmuz 2005
Temmuz 2005EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
SCI Kapsamındaki Dergi
Haziran 2004
Haziran 2004EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
SCI Kapsamındaki Dergi
Kasım 2003
Kasım 2003INFORMS Journal on Computing
SCI Kapsamındaki Dergi
Mayıs 2003
Mayıs 2003EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
SCI Kapsamındaki Dergi
Kasım 2002
Kasım 2002JOURNAL OF COMBINATORIAL OPTIMIZATION
SCI Kapsamındaki Dergi
Şubat 2002
Şubat 2002EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
SCI Kapsamındaki Dergi
Şubat 2001
Şubat 2001EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
SCI Kapsamındaki Dergi
Şubat 2000
Şubat 2000EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
SCI Kapsamındaki Dergi
Kongre ve Sempozyum Katılımı Faaliyetleri
14 Ağustos 2020 - 15 Ağustos 2020
14 Ağustos 2020 - 15 Ağustos 2020Global Joint Conference on Industrial Engineering and Its Application Areas
Davetli Konuşmacı
İstanbul-Türkiye
20 Nisan 2019 - 22 Nisan 2019
20 Nisan 2019 - 22 Nisan 2019VI. the International Conference on Artificial Intelligence and Applied Mathematics in Engineering
Davetli Konuşmacı
Antalya-Türkiye
08 Kasım 2018 - 10 Kasım 2018
08 Kasım 2018 - 10 Kasım 2018VI. International GAP Engineering Conference
Davetli Konuşmacı
Şanlıurfa-Türkiye
14 Ekim 2014 - 16 Ekim 2014
14 Ekim 2014 - 16 Ekim 201444th International Conference on Computers and Industrial Engineering
Davetli Konuşmacı
İstanbul-Türkiye
18 Şubat 2009 - 19 Şubat 2009
18 Şubat 2009 - 19 Şubat 2009The Sixth International Industrial Engineering Conference
Davetli Konuşmacı
Tehran-İran
Davetli Konuşmalar
Şubat 2009
Şubat 2009Manufacturing scheduling with setups
Seminer
University of Antwerp-Belçika
Ocak 2007
Ocak 2007Flowshop scheduling with separate setup times
Seminer
The Polytechnic University of Valencia-İspanya
Ocak 2005
Ocak 2005Scheduling with setup times
Seminer
The Hong Kong Polytechnic University-Hong Kong
Ağustos 2004
Ağustos 2004