Makaleler
139
Tümü (139)
SCI-E, SSCI, AHCI (91)
SCI-E, SSCI, AHCI, ESCI (99)
ESCI (8)
Scopus (117)
Diğer Yayınlar (20)
4. More effective heuristics for a two-machine no-wait flowshop to minimize maximum lateness
International Journal of Industrial Engineering Computations
, cilt.13, sa.4, ss.543-556, 2022 (SCI-Expanded)
7. A Review of Scheduling Problems with Bounded Processing/Setup Times
International Journal of Advanced Research in Engineering Innovation
, cilt.4, ss.64-69, 2022 (Hakemli Dergi)
11. Asean Journal of Engineering Education
Asean Journal of Engineering Education
, cilt.5, ss.23-29, 2021 (Hakemli Dergi)
13. Industrial and Management Systems Engineering program assessment based on the new ABET student outcomes
Asean Journal of Engineering Education
, cilt.5, ss.1-8, 2021 (Hakemli Dergi)
15. An Improved Algorithm for Minimizing Makespan on Flowshops with Uncertain Processing Times
International Journal of Engineering Research and Development
, cilt.13, ss.521-530, 2021 (Hakemli Dergi)
18. Sample Senior Design Projects of Industrial Engineering Program at Kuwait University
ASEAN Journal of Engineering Education
, cilt.4, ss.11-18, 2020 (Hakemli Dergi)
35. Total tardiness performance in m-machine no-wait flowshops with separate setup times
Intelligent Control and Automation
, cilt.6, ss.38-44, 2015 (Hakemli Dergi)
39. No-wait flowshops to minimize total tardiness with setup times
Intelligent Control and Automation
, cilt.6, ss.38-44, 2015 (Hakemli Dergi)
43. Algorithms for no-wait flowshops with total completion time subject to makespan
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY
, sa.9-12, ss.2237-2251, 2013 (SCI-Expanded)
46. Untitled
EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING
, sa.1, ss.1, 2013 (SCI-Expanded)
47. New heuristics for no-wait flowshops with performance measures of makespan and mean completion time
International Journal of Operations Research
, cilt.10, ss.29-37, 2013 (Hakemli Dergi)
51. No-wait flowshop scheduling problem to minimize the number of tardy jobs
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY
, sa.1-4, ss.311-323, 2012 (SCI-Expanded)
53. Better heuristics for a two-stage multi-machine assembly scheduling problem to minimize total completion time
International Journal of Operations Research
, cilt.9, ss.66-75, 2012 (Hakemli Dergi)
64. Three-machine flowshop scheduling problem to minimize maximum lateness with bounded setup and processing times
Journal of Operations and Logistics
, cilt.2, ss.1-11, 2009 (Hakemli Dergi)
71. Untitled
EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING
, sa.1, 2008 (SCI-Expanded)
73. No-wait flowshop with separate setup times to minimize maximum lateness
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY
, sa.5-6, ss.551-565, 2007 (SCI-Expanded)
79. Untitled
EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING
, sa.1, ss.1-4, 2007 (SCI-Expanded)
87. A hybrid tabu search heuristic for the two-stage assembly scheduling problem
International Journal of Operations Research
, cilt.3, ss.109-119, 2006 (Hakemli Dergi)
88. Economic order quantity with uncertain inflation: A case study
International Journal of Industrial Engineering : Theory Applications and Practice
, cilt.13, sa.3, ss.320-327, 2006 (SCI-Expanded)
95. A polynomial genetic based algorithm to minimize maximum lateness in a two-stage flowshop with setup times
International Journal of Operations Research
, cilt.2, ss.89-100, 2005 (Hakemli Dergi)
96. Two-machine flowshop scheduling problem to minimize makespan with bounded setup and processing times
International Journal of Agile Manufacturing
, cilt.8, ss.145-153, 2005 (Hakemli Dergi)
102. Stochastically minimizing makespan on a three-machine flowshop
INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE
, cilt.11, sa.2, ss.124-131, 2004 (SCI-Expanded)
128. Dual criteria scheduling on a two-machine flowshop subject to random breakdowns
INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH
, cilt.5, ss.317-327, 1998 (Hakemli Dergi)
Hakemli Bilimsel Toplantılarda Yayımlanmış Bildiriler
45
1. Scheduling on a three-machine flowshop with uncertain processing times to minimize makespan
Kuala Lumpur, Malaysia, 3rd International Virtual Conference on Education, Social Sciences and Technology, Kuala-Lumpur, Malezya, 12 Ağustos 2023, (Tam Metin Bildiri)
3. Minimizing total completion time for stochastic flowshops
Istanbul, Turkiye, 4th International E-Conference on Mathematical Advances and Applications, İstanbul, Türkiye, 26 Mayıs 2021, (Tam Metin Bildiri)
4. Four-machine flowshop scheduling problem with uncertain processing times to minimize mean completion time
Kuala Lumpur, Malaysia, International E-Conference on Applied Sciences, Society, and Economics, Kuala-Lumpur, Malezya, 04 Mayıs 2021, (Tam Metin Bildiri)
5. Minimizing makespan in flowshops with bounded processing times
Sanliurfa, Turkey, VI. International GAP Engineering Conference, Türkiye, 08 Kasım 2018, (Tam Metin Bildiri)
6. Minimizing mean completion time for bounded processing times in flowshops
Sanliurfa, Turkey, VI. International GAP Engineering Conference, Türkiye, 08 Kasım 2018, (Tam Metin Bildiri)
7. The two-machine no-wait flowshop problem with uncertain setup times
Tokat, Turkey, International Conference on Contemporary Issues in Business & Economics, Türkiye, 14 Temmuz 2018, (Tam Metin Bildiri)
8. Minimizing mean completion time for a two-machine no-wait flowshop scheduling problem
Tokat, Turkey, International Conference on Contemporary Issues in Business & Economics, Türkiye, 14 Temmuz 2018, (Tam Metin Bildiri)
9. Minimizing total completion time in no-wait flowshops with setup times
New York, USA, International Conference on Industrial Electronics and Systems Engineering, Amerika Birleşik Devletleri, 05 Haziran 2014, (Tam Metin Bildiri)
11. Assembly flowshop scheduling problem to minimize total tardiness
Harvard, Cambridge, USA, American Conference on Applied Mathematics, Amerika Birleşik Devletleri, 25 Ocak 2012, (Tam Metin Bildiri)
13. Heuristic Algorithms for Minimizing Total Completion Time in a Two-Machine Flowshop with Sequence-Independent Setup
Troyes, France, 39th International Conference on Computers & Industrial Engineering, Fransa, 06 Haziran 2009, (Tam Metin Bildiri)
18. Minimization of makespan and maximum tardiness subject to a maximum tardiness bound in flowshop problems
Istanbul, Turkey,Eleventh Inte rnational Workshop on Project Management and Scheduling, Türkiye, 28 Nisan 2008, (Tam Metin Bildiri)
19. Three-Machine Flowshop Scheduling Problem to Minimize Total Completion Time with Bounded Setup and Processing Times
Melaka, Malaysia, International Conference on Engineering & ICT: Meeting the Challenges of Advanced Manufacturing, Malezya, 27 Kasım 2007, (Tam Metin Bildiri)
20. Senior design course in Industrial Engineering at Kuwait University
Kuwait, Second International Conference on Engineering Education and Training, Kuveyt, 09 Nisan 2007, (Tam Metin Bildiri)
21. Assembly scheduling problem to minimize maximum lateness
Hammamet, Tunisia, Third International Conference on Advances in Mechanical Engineering and Mechanics, Tunus, 17 Aralık 2006, (Tam Metin Bildiri)
22. Fast genetic algorithms for lateness minimization no-wait flowshop with setup times
Iceland, 21st European Conference on Operational Research, İzlanda, 02 Temmuz 2006, (Özet Bildiri)
23. Two-stage assembly scheduling problem to minimize makespan with setup times
Poznan, Poland, Tenth International Workshop on Project Management and Scheduling, Polonya, 26 Nisan 2006, (Tam Metin Bildiri)
24. Stochastic local search methods for no-wait flowshops with sequence independent setup times
Poznan, Poland, Tenth International Workshop on Project Management and Scheduling, Polonya, 26 Nisan 2006, (Tam Metin Bildiri)
26. Minimizing makespan on a two-machine flowshop with unknown setup and processing times
Marrakech, Morocco, International Conference on Industrial Engineering and Systems Management, Fas, 16 Mayıs 2005, (Tam Metin Bildiri)
27. A new tabu search heuristic for the two-stage assembly scheduling problem
Marrakech, Morocco, International Conference on Industrial Engineering and Systems Management, Fas, 16 Mayıs 2005, (Tam Metin Bildiri)
28. Scheduling problem with random processing times to minimize total completion time
Kuwait, International Mechanical Engineering Conference, Kuveyt, 05 Aralık 2004, (Tam Metin Bildiri)
29. A genetic algorithm for experimental dominance relations in scheduling problems
Kuwait, International Mechanical Engineering Conference, Kuveyt, 05 Aralık 2004, (Tam Metin Bildiri)
30. The two-stage assembly flowshop scheduling problem
Kuwait, International Mechanical Engineering Conference, Kuveyt, 05 Aralık 2004, (Tam Metin Bildiri)
31. Heuristics for the two-stage assembly scheduling problem
Sakarya, Turkey, Fourth International Symposium on Intelligent Manufacturing Systems, Türkiye, 06 Eylül 2004, (Tam Metin Bildiri)
32. An evolutionary algorithm for empirical dominance relations in scheduling problems
Sakarya, Turkey, Fourth International Symposium on Intelligent Manufacturing Systems, Türkiye, 06 Eylül 2004, (Tam Metin Bildiri)
33. Three-Site Distributed Database Scheduling Problem
Nancy, France, Ninth International Workshop on Project Management and Scheduling, Fransa, 26 Nisan 2004, (Tam Metin Bildiri)
34. Empirically Discovering Dominance Relations for Scheduling Problems
Nancy, France, Ninth International Workshop on Project Management and Scheduling, Fransa, 26 Nisan 2004, (Tam Metin Bildiri)
36. Minimizing average service time in flexible multi-server internet architecture
Miedzyzdroje, Poland, Ninth International Multi-Conference of Advanced Computer Systems on Production System Design, Supply Chain Management and Logistics, Polonya, 23 Ekim 2002, (Tam Metin Bildiri)
37. Multimedia object requests scheduling for minimizing Variance of Response Time
Miedzyzdroje, Poland, Ninth International Multi-Conference of Advanced Computer Systems on Production System Design, Supply Chain Management and Logistics, Polonya, 23 Ekim 2002, (Tam Metin Bildiri)
38. No-wait flowshop scheduling with multi-criteria
Valencia, Spain, Eighth International Workshop on Project Management and Scheduling, İspanya, 03 Nisan 2002, (Tam Metin Bildiri)
39. Multimedia Objects Scheduling in WWW to Minimize Completion Time Variance
Valencia, Spain, Eighth International Workshop on Project Management and Scheduling, İspanya, 03 Nisan 2002, (Tam Metin Bildiri)
40. Flowshop scheduling with random and bounded setup times
Valencia, Spain, Eighth International Workshop on Project Management and Scheduling, İspanya, 03 Nisan 2002, (Tam Metin Bildiri)
41. Scheduling on Assembly Lines with Serial Duplicate Stations
Amman, Jordan, First International Industrial Engineering Conference, IIEC 2001, Ürdün, 23 Eylül 2001, (Tam Metin Bildiri)
42. Bicriteria scheduling on an m-machine no-wait flowshop
Amman, Jordan, First International Industrial Engineering Conference, IIEC 2001, Ürdün, 23 Eylül 2001, (Tam Metin Bildiri)
43. Two-machine flowshop scheduling with bounded processing times
Aussois, France, Fourth Workshop on Models and Algorithms for Planning and Scheduling Problems, Fransa, 17 Haziran 2001, (Tam Metin Bildiri)
44. Total completion time minimization in a two or three machines flowshops with bounded processing times
Bonn, Germany, Conference of the European Chapter on Combinatorial Optimization, ECCO XIV, Almanya, 31 Mayıs 2001, (Tam Metin Bildiri)
45. Modeling multimedia data objects allocation problem for Internet using two-machine flowshop
Osnabruck, Germany, Seventh International Workshop on Project Management and Scheduling, Almanya, 17 Nisan 2000, (Tam Metin Bildiri)