Yayınlar & Eserler

SCI, SSCI ve AHCI İndekslerine Giren Dergilerde Yayınlanan Makaleler

Diğer Dergilerde Yayınlanan Makaleler

Hakemli Kongre / Sempozyum Bildiri Kitaplarında Yer Alan Yayınlar

Scheduling on a three-machine flowshop with uncertain processing times to minimize makespan

Kuala Lumpur, Malaysia, 3rd International Virtual Conference on Education, Social Sciences and Technology, Kuala-Lumpur, Malezya, 12 Ağustos 2023

Scheduling Problems with Bounded Processing or Setup Times

Kuala, Lumpur, Malaysiam, 3rd International Multidisciplinary Conference on Education, Engineering and Social Sciences, Kuala-Lumpur, Malezya, 26 Kasım 2022 identifier identifier

Minimizing total completion time for stochastic flowshops

Istanbul, Turkiye, 4th International E-Conference on Mathematical Advances and Applications, İstanbul, Türkiye, 26 Mayıs 2021

Four-machine flowshop scheduling problem with uncertain processing times to minimize mean completion time

Kuala Lumpur, Malaysia, International E-Conference on Applied Sciences, Society, and Economics, Kuala-Lumpur, Malezya, 04 Mayıs 2021

Minimizing makespan in flowshops with bounded processing times

Sanliurfa, Turkey, VI. International GAP Engineering Conference, Türkiye, 08 Kasım 2018

Minimizing mean completion time for bounded processing times in flowshops

Sanliurfa, Turkey, VI. International GAP Engineering Conference, Türkiye, 08 Kasım 2018

The two-machine no-wait flowshop problem with uncertain setup times

Tokat, Turkey, International Conference on Contemporary Issues in Business & Economics, Türkiye, 14 Temmuz 2018

Minimizing mean completion time for a two-machine no-wait flowshop scheduling problem

Tokat, Turkey, International Conference on Contemporary Issues in Business & Economics, Türkiye, 14 Temmuz 2018

Minimizing total completion time in no-wait flowshops with setup times

New York, USA, International Conference on Industrial Electronics and Systems Engineering, Amerika Birleşik Devletleri, 05 Haziran 2014

A new heuristic for the queries scheduling problem on distributed database systems to minimize mean completion time

21st International Conference on Software Engineering and Data Engineering, SEDE 2012, Los Angeles, CA, Amerika Birleşik Devletleri, 27 - 29 Haziran 2012, ss.93-97 identifier

Assembly flowshop scheduling problem to minimize total tardiness

Harvard, Cambridge, USA, American Conference on Applied Mathematics, Amerika Birleşik Devletleri, 25 Ocak 2012

Project scheduling problem with weighted multi-skill resources: Enhancing the effeciancy of project scheduling

2010 International Conference on Computational Intelligence and Software Engineering, CiSE 2010, Wuhan, Çin, 10 - 12 Aralık 2010 identifier

Heuristic Algorithms for Minimizing Total Completion Time in a Two-Machine Flowshop with Sequence-Independent Setup

Troyes, France, 39th International Conference on Computers & Industrial Engineering, Fransa, 06 Haziran 2009

Heuristic algorithms for minimizing total completion time in a two-machineflowshop with sequence-independent setup times

2009 International Conference on Computers and Industrial Engineering, CIE 2009, Troyes, Fransa, 6 - 09 Temmuz 2009, ss.90-95 identifier

Two-stage assembly flowshop scheduling problem with maximum lateness and makespan

38th International Conference on Computers and Industrial Engineering 2008, Beijing, Çin, 31 Ekim - 02 Kasım 2008, cilt.2, ss.2021-2028 identifier

The two-stage assembly flowshop scheduling problem with setup times

38th International Conference on Computers and Industrial Engineering 2008, Beijing, Çin, 31 Ekim - 02 Kasım 2008, cilt.2, ss.2029-2035 identifier

Two-Stage Assembly Flowshop Scheduling Problem with Setup Times

Sakarya, Turkey, Sixth International Symposium on Intelligent Manufacturing Systems, Türkiye, 14 Ekim 2008 identifier

Minimization of makespan and maximum tardiness subject to a maximum tardiness bound in flowshop problems

Istanbul, Turkey,Eleventh Inte rnational Workshop on Project Management and Scheduling, Türkiye, 28 Nisan 2008

Three-Machine Flowshop Scheduling Problem to Minimize Total Completion Time with Bounded Setup and Processing Times

Melaka, Malaysia, International Conference on Engineering & ICT: Meeting the Challenges of Advanced Manufacturing, Malezya, 27 Kasım 2007

Senior design course in Industrial Engineering at Kuwait University

Kuwait, Second International Conference on Engineering Education and Training, Kuveyt, 09 Nisan 2007

Assembly scheduling problem to minimize maximum lateness

Hammamet, Tunisia, Third International Conference on Advances in Mechanical Engineering and Mechanics, Tunus, 17 Aralık 2006

Fast genetic algorithms for lateness minimization no-wait flowshop with setup times

Iceland, 21st European Conference on Operational Research, İzlanda, 02 Temmuz 2006

Two-stage assembly scheduling problem to minimize makespan with setup times

Poznan, Poland, Tenth International Workshop on Project Management and Scheduling, Polonya, 26 Nisan 2006

Stochastic local search methods for no-wait flowshops with sequence independent setup times

Poznan, Poland, Tenth International Workshop on Project Management and Scheduling, Polonya, 26 Nisan 2006

Computer assembly scheduling problem

ICSSSM'06: 2006 International Conference on Service Systems and Service Management, Troyes, Fransa, 25 - 27 Ekim 2006, cilt.2, ss.1188-1191 identifier

Minimizing makespan on a two-machine flowshop with unknown setup and processing times

Marrakech, Morocco, International Conference on Industrial Engineering and Systems Management, Fas, 16 Mayıs 2005

A new tabu search heuristic for the two-stage assembly scheduling problem

Marrakech, Morocco, International Conference on Industrial Engineering and Systems Management, Fas, 16 Mayıs 2005

Scheduling problem with random processing times to minimize total completion time

Kuwait, International Mechanical Engineering Conference, Kuveyt, 05 Aralık 2004

A genetic algorithm for experimental dominance relations in scheduling problems

Kuwait, International Mechanical Engineering Conference, Kuveyt, 05 Aralık 2004

The two-stage assembly flowshop scheduling problem

Kuwait, International Mechanical Engineering Conference, Kuveyt, 05 Aralık 2004

Heuristics for the two-stage assembly scheduling problem

Sakarya, Turkey, Fourth International Symposium on Intelligent Manufacturing Systems, Türkiye, 06 Eylül 2004

An evolutionary algorithm for empirical dominance relations in scheduling problems

Sakarya, Turkey, Fourth International Symposium on Intelligent Manufacturing Systems, Türkiye, 06 Eylül 2004

Three-Site Distributed Database Scheduling Problem

Nancy, France, Ninth International Workshop on Project Management and Scheduling, Fransa, 26 Nisan 2004

Empirically Discovering Dominance Relations for Scheduling Problems

Nancy, France, Ninth International Workshop on Project Management and Scheduling, Fransa, 26 Nisan 2004

Scheduling requests on multi-stage multi-server to increase quality of service

IFIP TC6 / WG6.2 and WG6.7 2nd International Conference on Network Control and Engineering for QoS, Security and Mobility, Net-Con 2003, Muscat, Umman, 13 - 15 Ekim 2003, cilt.133, ss.14-25 Creative Commons License identifier

Minimizing average service time in flexible multi-server internet architecture

Miedzyzdroje, Poland, Ninth International Multi-Conference of Advanced Computer Systems on Production System Design, Supply Chain Management and Logistics, Polonya, 23 Ekim 2002

Multimedia object requests scheduling for minimizing Variance of Response Time

Miedzyzdroje, Poland, Ninth International Multi-Conference of Advanced Computer Systems on Production System Design, Supply Chain Management and Logistics, Polonya, 23 Ekim 2002

No-wait flowshop scheduling with multi-criteria

Valencia, Spain, Eighth International Workshop on Project Management and Scheduling, İspanya, 03 Nisan 2002

Multimedia Objects Scheduling in WWW to Minimize Completion Time Variance

Valencia, Spain, Eighth International Workshop on Project Management and Scheduling, İspanya, 03 Nisan 2002

Flowshop scheduling with random and bounded setup times

Valencia, Spain, Eighth International Workshop on Project Management and Scheduling, İspanya, 03 Nisan 2002

Scheduling on Assembly Lines with Serial Duplicate Stations

Amman, Jordan, First International Industrial Engineering Conference, IIEC 2001, Ürdün, 23 Eylül 2001

Bicriteria scheduling on an m-machine no-wait flowshop

Amman, Jordan, First International Industrial Engineering Conference, IIEC 2001, Ürdün, 23 Eylül 2001

Two-machine flowshop scheduling with bounded processing times

Aussois, France, Fourth Workshop on Models and Algorithms for Planning and Scheduling Problems, Fransa, 17 Haziran 2001

Total completion time minimization in a two or three machines flowshops with bounded processing times

Bonn, Germany, Conference of the European Chapter on Combinatorial Optimization, ECCO XIV, Almanya, 31 Mayıs 2001

Modeling multimedia data objects allocation problem for Internet using two-machine flowshop

Osnabruck, Germany, Seventh International Workshop on Project Management and Scheduling, Almanya, 17 Nisan 2000

Metrikler

Yayın

184

Atıf (WoS)

4333

H-İndeks (WoS)

30

Atıf (Scopus)

5236

H-İndeks (Scopus)

33

Atıf (Scholar)

2830

H-İndeks (Scholar)

4

Proje

24

Açık Erişim

4
BM Sürdürülebilir Kalkınma Amaçları