Yayınlar & Eserler

Makaleler 139
Tümü (139)
SCI-E, SSCI, AHCI (91)
SCI-E, SSCI, AHCI, ESCI (99)
ESCI (8)
Scopus (117)
Diğer Yayınlar (20)
Hakemli Bilimsel Toplantılarda Yayımlanmış Bildiriler 45

1. Scheduling on a three-machine flowshop with uncertain processing times to minimize makespan

Kuala Lumpur, Malaysia, 3rd International Virtual Conference on Education, Social Sciences and Technology, Kuala-Lumpur, Malezya, 12 Ağustos 2023, (Tam Metin Bildiri)

2. Scheduling Problems with Bounded Processing or Setup Times

Kuala, Lumpur, Malaysiam, 3rd International Multidisciplinary Conference on Education, Engineering and Social Sciences, Kuala-Lumpur, Malezya, 26 Kasım 2022, (Tam Metin Bildiri) identifier identifier

3. Minimizing total completion time for stochastic flowshops

Istanbul, Turkiye, 4th International E-Conference on Mathematical Advances and Applications, İstanbul, Türkiye, 26 Mayıs 2021, (Tam Metin Bildiri)

4. Four-machine flowshop scheduling problem with uncertain processing times to minimize mean completion time

Kuala Lumpur, Malaysia, International E-Conference on Applied Sciences, Society, and Economics, Kuala-Lumpur, Malezya, 04 Mayıs 2021, (Tam Metin Bildiri)

5. Minimizing makespan in flowshops with bounded processing times

Sanliurfa, Turkey, VI. International GAP Engineering Conference, Türkiye, 08 Kasım 2018, (Tam Metin Bildiri)

6. Minimizing mean completion time for bounded processing times in flowshops

Sanliurfa, Turkey, VI. International GAP Engineering Conference, Türkiye, 08 Kasım 2018, (Tam Metin Bildiri)

7. The two-machine no-wait flowshop problem with uncertain setup times

Tokat, Turkey, International Conference on Contemporary Issues in Business & Economics, Türkiye, 14 Temmuz 2018, (Tam Metin Bildiri)

8. Minimizing mean completion time for a two-machine no-wait flowshop scheduling problem

Tokat, Turkey, International Conference on Contemporary Issues in Business & Economics, Türkiye, 14 Temmuz 2018, (Tam Metin Bildiri)

9. Minimizing total completion time in no-wait flowshops with setup times

New York, USA, International Conference on Industrial Electronics and Systems Engineering, Amerika Birleşik Devletleri, 05 Haziran 2014, (Tam Metin Bildiri)

10. A new heuristic for the queries scheduling problem on distributed database systems to minimize mean completion time

21st International Conference on Software Engineering and Data Engineering, SEDE 2012, Los Angeles, CA, Amerika Birleşik Devletleri, 27 - 29 Haziran 2012, ss.93-97, (Tam Metin Bildiri) identifier

11. Assembly flowshop scheduling problem to minimize total tardiness

Harvard, Cambridge, USA, American Conference on Applied Mathematics, Amerika Birleşik Devletleri, 25 Ocak 2012, (Tam Metin Bildiri)

12. Project scheduling problem with weighted multi-skill resources: Enhancing the effeciancy of project scheduling

2010 International Conference on Computational Intelligence and Software Engineering, CiSE 2010, Wuhan, Çin, 10 - 12 Aralık 2010, (Tam Metin Bildiri) identifier

13. Heuristic Algorithms for Minimizing Total Completion Time in a Two-Machine Flowshop with Sequence-Independent Setup

Troyes, France, 39th International Conference on Computers & Industrial Engineering, Fransa, 06 Haziran 2009, (Tam Metin Bildiri)

14. Heuristic algorithms for minimizing total completion time in a two-machineflowshop with sequence-independent setup times

2009 International Conference on Computers and Industrial Engineering, CIE 2009, Troyes, Fransa, 6 - 09 Temmuz 2009, ss.90-95, (Tam Metin Bildiri) identifier

15. Two-stage assembly flowshop scheduling problem with maximum lateness and makespan

38th International Conference on Computers and Industrial Engineering 2008, Beijing, Çin, 31 Ekim - 02 Kasım 2008, cilt.2, ss.2021-2028, (Tam Metin Bildiri) identifier

16. The two-stage assembly flowshop scheduling problem with setup times

38th International Conference on Computers and Industrial Engineering 2008, Beijing, Çin, 31 Ekim - 02 Kasım 2008, cilt.2, ss.2029-2035, (Tam Metin Bildiri) identifier

17. Two-Stage Assembly Flowshop Scheduling Problem with Setup Times

Sakarya, Turkey, Sixth International Symposium on Intelligent Manufacturing Systems, Türkiye, 14 Ekim 2008, (Tam Metin Bildiri) identifier

18. Minimization of makespan and maximum tardiness subject to a maximum tardiness bound in flowshop problems

Istanbul, Turkey,Eleventh Inte rnational Workshop on Project Management and Scheduling, Türkiye, 28 Nisan 2008, (Tam Metin Bildiri)

19. Three-Machine Flowshop Scheduling Problem to Minimize Total Completion Time with Bounded Setup and Processing Times

Melaka, Malaysia, International Conference on Engineering & ICT: Meeting the Challenges of Advanced Manufacturing, Malezya, 27 Kasım 2007, (Tam Metin Bildiri)

20. Senior design course in Industrial Engineering at Kuwait University

Kuwait, Second International Conference on Engineering Education and Training, Kuveyt, 09 Nisan 2007, (Tam Metin Bildiri)

21. Assembly scheduling problem to minimize maximum lateness

Hammamet, Tunisia, Third International Conference on Advances in Mechanical Engineering and Mechanics, Tunus, 17 Aralık 2006, (Tam Metin Bildiri)

22. Fast genetic algorithms for lateness minimization no-wait flowshop with setup times

Iceland, 21st European Conference on Operational Research, İzlanda, 02 Temmuz 2006, (Özet Bildiri)

23. Two-stage assembly scheduling problem to minimize makespan with setup times

Poznan, Poland, Tenth International Workshop on Project Management and Scheduling, Polonya, 26 Nisan 2006, (Tam Metin Bildiri)

24. Stochastic local search methods for no-wait flowshops with sequence independent setup times

Poznan, Poland, Tenth International Workshop on Project Management and Scheduling, Polonya, 26 Nisan 2006, (Tam Metin Bildiri)

25. Computer assembly scheduling problem

ICSSSM'06: 2006 International Conference on Service Systems and Service Management, Troyes, Fransa, 25 - 27 Ekim 2006, cilt.2, ss.1188-1191, (Tam Metin Bildiri) identifier

26. Minimizing makespan on a two-machine flowshop with unknown setup and processing times

Marrakech, Morocco, International Conference on Industrial Engineering and Systems Management, Fas, 16 Mayıs 2005, (Tam Metin Bildiri)

27. A new tabu search heuristic for the two-stage assembly scheduling problem

Marrakech, Morocco, International Conference on Industrial Engineering and Systems Management, Fas, 16 Mayıs 2005, (Tam Metin Bildiri)

28. Scheduling problem with random processing times to minimize total completion time

Kuwait, International Mechanical Engineering Conference, Kuveyt, 05 Aralık 2004, (Tam Metin Bildiri)

29. A genetic algorithm for experimental dominance relations in scheduling problems

Kuwait, International Mechanical Engineering Conference, Kuveyt, 05 Aralık 2004, (Tam Metin Bildiri)

30. The two-stage assembly flowshop scheduling problem

Kuwait, International Mechanical Engineering Conference, Kuveyt, 05 Aralık 2004, (Tam Metin Bildiri)

31. Heuristics for the two-stage assembly scheduling problem

Sakarya, Turkey, Fourth International Symposium on Intelligent Manufacturing Systems, Türkiye, 06 Eylül 2004, (Tam Metin Bildiri)

32. An evolutionary algorithm for empirical dominance relations in scheduling problems

Sakarya, Turkey, Fourth International Symposium on Intelligent Manufacturing Systems, Türkiye, 06 Eylül 2004, (Tam Metin Bildiri)

33. Three-Site Distributed Database Scheduling Problem

Nancy, France, Ninth International Workshop on Project Management and Scheduling, Fransa, 26 Nisan 2004, (Tam Metin Bildiri)

34. Empirically Discovering Dominance Relations for Scheduling Problems

Nancy, France, Ninth International Workshop on Project Management and Scheduling, Fransa, 26 Nisan 2004, (Tam Metin Bildiri)

35. Scheduling requests on multi-stage multi-server to increase quality of service

IFIP TC6 / WG6.2 and WG6.7 2nd International Conference on Network Control and Engineering for QoS, Security and Mobility, Net-Con 2003, Muscat, Umman, 13 - 15 Ekim 2003, cilt.133, ss.14-25, (Tam Metin Bildiri) Creative Commons License identifier

36. Minimizing average service time in flexible multi-server internet architecture

Miedzyzdroje, Poland, Ninth International Multi-Conference of Advanced Computer Systems on Production System Design, Supply Chain Management and Logistics, Polonya, 23 Ekim 2002, (Tam Metin Bildiri)

37. Multimedia object requests scheduling for minimizing Variance of Response Time

Miedzyzdroje, Poland, Ninth International Multi-Conference of Advanced Computer Systems on Production System Design, Supply Chain Management and Logistics, Polonya, 23 Ekim 2002, (Tam Metin Bildiri)

38. No-wait flowshop scheduling with multi-criteria

Valencia, Spain, Eighth International Workshop on Project Management and Scheduling, İspanya, 03 Nisan 2002, (Tam Metin Bildiri)

39. Multimedia Objects Scheduling in WWW to Minimize Completion Time Variance

Valencia, Spain, Eighth International Workshop on Project Management and Scheduling, İspanya, 03 Nisan 2002, (Tam Metin Bildiri)

40. Flowshop scheduling with random and bounded setup times

Valencia, Spain, Eighth International Workshop on Project Management and Scheduling, İspanya, 03 Nisan 2002, (Tam Metin Bildiri)

41. Scheduling on Assembly Lines with Serial Duplicate Stations

Amman, Jordan, First International Industrial Engineering Conference, IIEC 2001, Ürdün, 23 Eylül 2001, (Tam Metin Bildiri)

42. Bicriteria scheduling on an m-machine no-wait flowshop

Amman, Jordan, First International Industrial Engineering Conference, IIEC 2001, Ürdün, 23 Eylül 2001, (Tam Metin Bildiri)

43. Two-machine flowshop scheduling with bounded processing times

Aussois, France, Fourth Workshop on Models and Algorithms for Planning and Scheduling Problems, Fransa, 17 Haziran 2001, (Tam Metin Bildiri)

44. Total completion time minimization in a two or three machines flowshops with bounded processing times

Bonn, Germany, Conference of the European Chapter on Combinatorial Optimization, ECCO XIV, Almanya, 31 Mayıs 2001, (Tam Metin Bildiri)

45. Modeling multimedia data objects allocation problem for Internet using two-machine flowshop

Osnabruck, Germany, Seventh International Workshop on Project Management and Scheduling, Almanya, 17 Nisan 2000, (Tam Metin Bildiri)
Metrikler

Yayın

190

Yayın (WoS)

100

Yayın (Scopus)

126

Atıf (WoS)

4646

H-İndeks (WoS)

31

Atıf (Scopus)

5821

H-İndeks (Scopus)

35

Atıf (Scholar)

8900

H-İndeks (Scholar)

4

Proje

24

Açık Erişim

4
BM Sürdürülebilir Kalkınma Amaçları